Laserfiche WebLink
23.Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. Iri accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water'pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following:. <br /> Piping 3/, inch'(19.1 grim)and larger in nominal diameter.. <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside'the conditioned space. <br /> Piping from the water heater to a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Slower,door test shall be provided before C.O: <br /> 26.A copy of the energy cacls shall be with permit at all tines. <br /> 2 Z Copy of final insulation reo6it shall be provided with permit before final <br /> 28. No fence,pool or screen enclosure''is issued with:this perinit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />