My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21144
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 11:19:29 AM
Creation date
1/7/2020 11:19:27 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-21144
Building Department - Name
MARCHINIAK,LAWRENCE & VIRGINIA
Address
6901 MEDICAL VIEW LN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:86A82CI3-FF5C-450E-A96B-7CF27BA522DB <br /> Not later than Seventy 70 calendar days from the date of commencement of the Work. <br /> By the following date: <br /> §3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents,if portions of the Work are <br /> to be completed prior to Substantial Completion of the entire Work,the Contractor shall achieve Substantial <br /> Completion of such portions by the following dates: <br /> Portion of Work Substantial Completion Date <br /> §3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3,liquidated damages,if <br /> any,shall be assessed as set forth in Section 4.5. <br /> y. <br /> ARTICLE 4 CONTRACT SUM <br /> §4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the <br /> Contract.The Contract Sum shall be Two Hundred Thirteen Thousand and Fifty Five Dollars 213,055.00 <br /> subject to additions and deductions as provided in the Contract Documents. kq— Cc <br /> §4.2 Alternates <br /> §4.2.1 Alternates,if any,included in the Contract Sum: <br /> Item Price <br /> §4.2.2 Subject to the conditions noted below,the following alternates may be accepted by the Owner following <br /> execution of this Agreement.Upon acceptance,the Owner shall issue a Modification to this Agreement. <br /> Item Price Conditions for Acceptance <br /> §4,3 Allowances,if any,included in the Contract Sum: <br /> Item Price <br /> §4.4 Unit prices,if any: <br /> 14 <br /> Item Units and Limitations Price per Unit($0.00) <br /> §4.5 Liquidated damages,if any: <br /> §4.6.Other: <br /> Cost of Building Permits are excluded and are in addition to the stipulated contract sum, to be Tstw' Ll <br /> Dia,'ALA <br /> AIA Document A101Tm-2017.Copyright Q 1916,1918,1925,1937.1951,1958,1961,1963,1967,1974,1977,1987,1991,1997,2007 and 2017 by The Xci 11 <br /> Init. American Institute of Architects.All rights reserved.WARNING:This AIAO Document is protected by U.S.Copyright Law and International Treaties. <br /> Unauthorized reproduction or distribution of this AIAO Document,c�r any portion of It,may result In severe civil and criminal penalties,and will be 3 <br /> prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 09:03A9 ET on 03/0612019 under Order <br /> No.4880709151 which expires on 10/02/2019,and is not for resale.User Notes: (1919377707) <br />
The URL can be used to link to this page
Your browser does not support the video tag.