My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21144
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 11:19:29 AM
Creation date
1/7/2020 11:19:27 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-21144
Building Department - Name
MARCHINIAK,LAWRENCE & VIRGINIA
Address
6901 MEDICAL VIEW LN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:86A82C I 13-FF5C-45OF-A96B-7CF27BA522DB <br /> §5.1.7.1.1 The following items are not subject to retainage: <br /> N/A <br /> §5.1.7.2 Reduction or limitation of retainage,if any,shall be as follows: <br /> N/A <br /> 5.1.7.3 Except as set forth in this Section 5.1.7.3..upon Substantial Completion of the Work,the Contractor may <br /> submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant <br /> to this Section 5.1.7.The Application for Payment submitted at Substantial Completion shall not include retainage as <br /> follows: <br /> §5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor,the Owner shall pay,the <br /> Contractor any additional amounts in accordance with Article 9 of AIA Document A2012017 Aa-qCLrLA-L&,r amc,%ArAs <br /> il %d-ar-- Wej- ' CE <br /> f <br /> §6.1.9 Except with the Owner's prior approval,the Contractor shall not make advance payments to suppliers for K <br /> materials or equipment which have not been delivered and stored at the site. <br /> §5.2 Final Payment <br /> §5.2.1 Final payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the <br /> Contractor when <br /> .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct <br /> Work as provided in Article 12 of AIA Document A201-2017,and to satisfy other requirements,if any, <br /> which extend beyond final payment;and <br /> .2 a final Certificate for Payment has been issued by the Architect. <br /> §5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the <br /> Architect's final Certificate for Payment,or as follows: <br /> §5.3 Interest <br /> Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, <br /> or in the absence thereof,at the legal rate prevailing from time to time at the place where the Project is located, <br /> Eight% 8% <br /> ARTICLE 6 DISPUTE RESOLUTION <br /> §6.1 Initial Decision Maker <br /> The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201-2017,Unless the <br /> parties appoint below another individual,not a party to this Agreement,to Serve as the Initial Decision Maker. <br /> Init. AIA Document Al 01 2017.Copyright0 ISIS,1918,1925.1937.1951.1956,1961,1963,1987,1974,1977,1987,1991.1997,2007 and 2017 by The <br /> American Institute of Architects.Ali rights reserved.WARNING:This AIAP Document Is protected by U.S.Copyright Law and International Treaties. <br /> Unauthorized reproduction or distribution of this AIA6 Document,or any portion of It,may result In severe civil and criminal penalties,and will be <br /> prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 09:03:49 ET on 03/0812019 under Order <br /> No.4860709151 which expires on 1010212019,and Is not for resale. <br /> User Notes: (1919377707) <br />
The URL can be used to link to this page
Your browser does not support the video tag.