Laserfiche WebLink
Envelope Leakage Test Report (Blower Door Test) <br /> Residential Prescriptive, Performance or ERI Method Compliance <br /> 2017 Florida Building Code, Energy Conservation, 6th Edition <br /> [Jurisdiction: City of Zephyrhills Permit#: 21149 <br /> Job Information: <br /> Builder: pep- cje{4 p iX6,1 Community:--- Lot: <br /> Address: 5010181h Street A Unit,,,,. <br /> City: Zephyrhills State. FLORIDA %' Zip: . :;33542 <br /> Air Leakage Test'Results: Passing results must meet either the Performance,Prescriptive,orERl,Method: <br /> ® PRESCRIPTIVE'METHOD-The buildi6g";dwellingunitshall,betestedand verified as having an air leakage;rateof not exceeding7.airchanges <br /> per hour at a pressure of0.2 inch w.g.(50;pascals)in.Clirnate Zones 1 and 2. <br /> ❑ PERFORMANCE or ERI METHOD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the <br /> selected ACN(50)value;asshown on FORIN R405-2017(Performance)or R406-2017(ERI),section labeled as lnfiltration,sub.-section ACH: <br /> 'DACH(50)speed on Form^R4051017--Ener Calc(Performance)or R406-2017(ERI): <br /> Method for calculating building volume''• <br /> 1060 X 60 14184 = 4.48 ® Retrieved from architectural plans <br /> x CFM(50l Building.Volume ACH(50) 4i <br /> ❑ Code software calculated <br /> 'PASS FAI L <br /> i 0 When ACH(50)is,lessahan 3 ACHSo;Mechanical Ventilation Field'measu,red and'calciilated E1 Field measured'and calculated <br /> installation:m"ust be v: ied'by bui(ding department. <br /> y Testing.TestingshallbeconductedinaccordancewithANSI/RESNEr/ICt380andleportedatapressuieor0.2 inches wi g&(50Pascals).Testing shall be conducted byeither <br /> individuals as defined in Section 553.993(-1 or(7),Florida Statues,or Individuals licensed asset forth inSection <br /> 489.SOS(3)(I),(g),or(i)oran approved third party.Awritten report ofthe results ofthetestshallbesignedby.thepartyconducting the test and providedtothecodeoffrciaL <br /> Testingshallbe performed atanytimeaftercreationofallpenetrationsofthe_buildingtiiermalenvelope% - - <br /> During testing: l i <br /> L Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weather-strippingor other infiltration control measure's.;' <br /> a2 pampers including exhaust,intake,makeup air,back draftand flue dampers shalI be closed,but notsealed beyond intended infiltration control measures. r_ <br /> 3.Interior doors,if installed at the time of the test,shall be open. x <br /> 4:,Exteiior doors for continuous'ventilation systems and heat recovery ventilators shall be closed and sealed. <br /> 5.'Heating and cooling systems,if installed atthe time of the test,shall be turned off. <br /> 6.Supply'and return registers,if installed at the time of the test,shall be fully open. <br /> Testing Company f ` <br /> Company Name: airEnalasys. Phone: 877-437=7728 : " .- <br /> 1 hereby verify that the above.Air Leakage results:are.in accordance with the 2017 6th,Edition Florida Building Code Energy,;' <br /> Conservation requirements according to the-compliance"method-selected above:. f- <br /> Signature of Tester:' Q p Date oft: =11/12/19 <br /> 7�V..1 <br /> Printed Name of Tester:'`~ `"'William Ma go <br /> t� <br /> License/Ce rtification# 4309320,,-A`` ' = _ _ Issuing.Authority: -,-FSEC RESNET <br />