Laserfiche WebLink
cmaidi��� <br /> V�Sa <br /> QIy� p�0 <br /> 4y S 1 1an ®®��Roofing,�p 0 5%fee for credit card processing. <br /> * _ A Division of Rymon Construction,Inc. <br /> 36413 SR 54 - Zephyrhills, Florida 33541 Proposal# <br /> Phone (813) 782-6094 • Fax(813) 788-6773 No. 00200®� 1-855-Go-Ryman (1-855-467-9626) • Lic.#CCC 1325505 Estimate# <br /> www.RymanRoofing.com. �- <br /> R® Serving all of Central Florida Job# <br /> owner/Purchaser:Clayton Mlligan Date: 5/3/19 <br /> Claim#: InsuranceCompany: <br /> Policy# <br /> Job Address: 39528 Meadowwood Loop City: Zephyrhills Zip: 33542 <br /> Mail to Address: E-Mail Address: <br /> Home #: 813-245-5388 Cell #: 813-493-2377 Business #: <br /> F✓ Complete tear off of existing Asphalt shingles Additional Notes/Special Concerns: Includes <br /> One laver included Install new GAF Timberline hd dimensional limited <br /> ❑✓ Secure all loose roof decking as needed according lifetime shingles <br /> to Florida Building Codes <br /> 'FV Roof dried in with Synthetic Rhino roof synthetic underlayment <br /> Repair wood fascia/rake damaged by tree <br /> Q✓ Install new valley metal with galvanized metalInstall existing soffit that has fallen <br /> 0✓ Install new 6 "drip edge color: <br /> Q Install new lead boots Install new aluminum fascia wrap on left rake <br /> Q✓ Install all new general roof vents <br /> n✓ Install new ❑✓ Shingle ❑Metal Tile <br /> Modified Butimen FTPO Three sheets of plywood included <br /> Manufacturer (shingle, metal or tile) GAF <br /> Manufacturer RPo or Mod. Bitumen) <br /> Q✓ Color:(Shingle,MetalorTile) Birchwood <br /> Permit and scheduling of inspections <br /> Color:(TPOorMOD.Bitumen) <br /> 0✓ All roof related debris removed from job site,pick-up loose <br /> nails using commercial grade magnet -7 <br /> 0✓ All materials, labor and permits furnished Base Price*$ 7� / 08.00 <br /> F.71 Provide a 5 year labor warranty <br /> Additional Items: <br /> Payment Method: Check# (� �1� Cash Financing ❑Insurance Claim <br /> ❑ Credit Card IF Exp. Date CC ID# <br /> Down Payment:$ 3000 Amount Financed:$ Approx. Monthly Payment: $ <br /> PaymentTerms: 35% down and balance upon completion <br /> Extras: <br /> *Base Price does NOT include any unforeseen costs as described below unless indicated in"Additional Items"above. cusromeriniriat <br /> ilk Deficient 1/2"plywood replaced at a cost of$ 65.00 per sheet in the roof field,which includes labor&materials.All other wood work/ad- <br /> i itonal labor, such as, but not limited to,valley rebuilding, rafter replacement, I decking,etc.will be a rate of$5.00 per lineal foot plus the <br /> cost of materials. <br /> THIS BECOMES A BINDING C TRACT UPON ACCEPTAIJCE.,OF PRIDPOSAL.PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> IACCEPT THIS PROPOSAL H EB �tHpftjg AD AND FULLY UNDERSTAND THE PROVISIONS OF THIS CONTRACT. <br /> Purchaser: Date.:5/3/19 <br /> - - - Ed <br />