Laserfiche WebLink
)TICE OF DEED The undersigned understands that this permit may be subject to"deed"restrictions" <br /> ich may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> dcab(edaed restrictions. <br /> LICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor mr <br /> itractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the <br /> /tractor is not licensed as required by (ovv, both the oxvne, and contractor may be cited for a misdemeanor violation <br /> |er state law. If the owner or intended contractor are uncertain as to xxhol licensing requirements *may apply for the <br /> nded work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- <br /> 19. Furthermnona, if the owner has hired o contractor orcontractors, he is advised to have the contractor(s) sign <br /> ions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the <br /> tnocbnr, that may ba an indication that he is not properly licensed and is not entitled bo permitting privileges in Pasco <br /> |Dty, <br /> &NSP0RTATIO$JIMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br /> Transportation Impact Fees and Recourse Recovery Fees may apply tm the construction nf new buildings, change of <br /> in existing bui|din0s, or expansion of existing bui|dinga, as specified in Pasco County Ordinance number 80-07 and <br /> )7. aoamended. The undersigned also understands, that such fees, as may be due, will be identified at the time of <br /> nitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> .iving e "certificate of occupancy' or final power na|aasm. If the project does not involve s certificate of occupancy or <br /> power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco CountyWahor/Gevver Impact <br /> are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. <br /> ISTRUCTyONLVEN LAW(Chapter 713, Florida Statutes,as amended): If valuation of work|e$2.5OD.00or more, | <br /> h/ that |, the oppUoant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's <br /> Bction Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. |f the applicant issomeone <br /> r than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to <br /> -eritbn the^ow/ner'prior tocommencement. <br /> |lrRACTORVO#NER^S AFFIDAVIT: | certify that all the information in this application in accurate and that all vxod« <br /> )e done in compliance with all applicable laws regulating construction, zoning and land development. Application is <br /> by made to obtain o permit to do vvo,h and installation as indicated. ) certify that no work or installation has <br /> nmnuad prior to issuance "of a permit and that all work will be performed to meet standards of all laws regulating <br /> truotion. County and City codes, zoning n*gu|gUono. and land development naQu|ebonn in the jurisdiction. ! also <br /> ' that I understand that the regulations of other government agencies may apply to the intended work, and that it is <br /> �nponoibUdvto identify what actions | must take bobmincompliance. Such agencies include but are not limited to: <br /> Department ofEnvironmental Protection-Cypress Bovhmodo, Wetland Areas and Environmentally Sensitive <br /> Lands,Water/Wastewater Treatment. <br /> Southwest Florida Water Management Qistrict-VVmUs, Cypress Bayheods, Wetland Areas, Altering <br /> VVebsroounoem. <br /> Army Corps ofEngin*am'GeowoUs' Docks, Navigable Waterways. <br /> Department of Health & Rehabilitative Services/Environmental Health Un|t-VVeUe, VVoatemabar Treatment, <br /> Septic Tanks. <br /> US Environmental Protection Agency-Asbestos abatement. <br /> ^ Federal Aviation Authorih+Runwayo. <br /> BrVtand that the following restrictions apply bo the use offill: <br /> Use mf fill io not allowed in Flood Zone Wp unless expressly permitted. <br /> If the fill material is to be used in Flood Zone ^A^, it is understood that a drainage plan addressing a <br /> ,.compensating volume" will be submitted at time of permitting which is pnoponad by professional engineer <br /> licensed bv the State ofF|ohdo. <br /> � the �U '$teria| is to be used in Flood Zone ^A" in cnnneobon with a permitted building using ahern vvaU <br /> construction, | oedifvthat fiUvviUbe used only to�U the area xxithinthe stem wall. <br /> If fill material is to'be used in any area, | certify that use of such fill will not adversely off»ot adjacent <br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1) <br /> acre which are elevated by fill, an engineered drainage plan imrequired. <br /> / the AGENT FOR THE OWNER, | promise in good faith toinform the owner Vf the permitting conditions set forth in <br /> fidovit prior to commencing construction. | understand that a separate permit may bm required for electrical work, <br /> ing, oiQns, vva|s, poo|o, air condiUoning, gam, or other insbo||oUmnm not specifically included in the application. A <br /> issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or <br /> ide any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter <br /> nQa correction of errors in plans, construction mr violations of any codes. Every permit issued shall become invalid <br /> the work authorized by such permit is commenced within six months of permit |nmuonca. or �xvork authorized by <br /> rmn�ieoumpendedorabandoned for o period of six(0)months after the time the work iocommenced. An extension <br /> e requested, in writing, from the Building Official for o period not to exceed ninety (QD) days and will demonstrate <br /> bde cause for the extension. If work ceases for ninety(90)consecutive days, the job is considered abandoned. <br /> | ��� TO OWNER: YOUR FAILURE TO RECORD ANOTICEOF�� � COMMENCEMENT MAY RESULT IN YOUR <br /> � TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT <br /> IrOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. <br /> - - <br /> OR AGENT 60 ,/ CONTRACTOR <br /> Notary Public <br /> afy Public <br /> Co <br /> ___ <br />