)TICE OF DEED The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> ich may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> dcab(edaed restrictions.
<br /> LICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor mr
<br /> itractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> /tractor is not licensed as required by (ovv, both the oxvne, and contractor may be cited for a misdemeanor violation
<br /> |er state law. If the owner or intended contractor are uncertain as to xxhol licensing requirements *may apply for the
<br /> nded work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 19. Furthermnona, if the owner has hired o contractor orcontractors, he is advised to have the contractor(s) sign
<br /> ions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
<br /> tnocbnr, that may ba an indication that he is not properly licensed and is not entitled bo permitting privileges in Pasco
<br /> |Dty,
<br /> &NSP0RTATIO$JIMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> Transportation Impact Fees and Recourse Recovery Fees may apply tm the construction nf new buildings, change of
<br /> in existing bui|din0s, or expansion of existing bui|dinga, as specified in Pasco County Ordinance number 80-07 and
<br /> )7. aoamended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br /> nitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> .iving e "certificate of occupancy' or final power na|aasm. If the project does not involve s certificate of occupancy or
<br /> power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco CountyWahor/Gevver Impact
<br /> are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> ISTRUCTyONLVEN LAW(Chapter 713, Florida Statutes,as amended): If valuation of work|e$2.5OD.00or more, |
<br /> h/ that |, the oppUoant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Bction Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. |f the applicant issomeone
<br /> r than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> -eritbn the^ow/ner'prior tocommencement.
<br /> |lrRACTORVO#NER^S AFFIDAVIT: | certify that all the information in this application in accurate and that all vxod«
<br /> )e done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> by made to obtain o permit to do vvo,h and installation as indicated. ) certify that no work or installation has
<br /> nmnuad prior to issuance "of a permit and that all work will be performed to meet standards of all laws regulating
<br /> truotion. County and City codes, zoning n*gu|gUono. and land development naQu|ebonn in the jurisdiction. ! also
<br /> ' that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> �nponoibUdvto identify what actions | must take bobmincompliance. Such agencies include but are not limited to:
<br /> Department ofEnvironmental Protection-Cypress Bovhmodo, Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> Southwest Florida Water Management Qistrict-VVmUs, Cypress Bayheods, Wetland Areas, Altering
<br /> VVebsroounoem.
<br /> Army Corps ofEngin*am'GeowoUs' Docks, Navigable Waterways.
<br /> Department of Health & Rehabilitative Services/Environmental Health Un|t-VVeUe, VVoatemabar Treatment,
<br /> Septic Tanks.
<br /> US Environmental Protection Agency-Asbestos abatement.
<br /> ^ Federal Aviation Authorih+Runwayo.
<br /> BrVtand that the following restrictions apply bo the use offill:
<br /> Use mf fill io not allowed in Flood Zone Wp unless expressly permitted.
<br /> If the fill material is to be used in Flood Zone ^A^, it is understood that a drainage plan addressing a
<br /> ,.compensating volume" will be submitted at time of permitting which is pnoponad by professional engineer
<br /> licensed bv the State ofF|ohdo.
<br /> � the �U '$teria| is to be used in Flood Zone ^A" in cnnneobon with a permitted building using ahern vvaU
<br /> construction, | oedifvthat fiUvviUbe used only to�U the area xxithinthe stem wall.
<br /> If fill material is to'be used in any area, | certify that use of such fill will not adversely off»ot adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan imrequired.
<br /> / the AGENT FOR THE OWNER, | promise in good faith toinform the owner Vf the permitting conditions set forth in
<br /> fidovit prior to commencing construction. | understand that a separate permit may bm required for electrical work,
<br /> ing, oiQns, vva|s, poo|o, air condiUoning, gam, or other insbo||oUmnm not specifically included in the application. A
<br /> issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
<br /> ide any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
<br /> nQa correction of errors in plans, construction mr violations of any codes. Every permit issued shall become invalid
<br /> the work authorized by such permit is commenced within six months of permit |nmuonca. or �xvork authorized by
<br /> rmn�ieoumpendedorabandoned for o period of six(0)months after the time the work iocommenced. An extension
<br /> e requested, in writing, from the Building Official for o period not to exceed ninety (QD) days and will demonstrate
<br /> bde cause for the extension. If work ceases for ninety(90)consecutive days, the job is considered abandoned.
<br /> | ��� TO OWNER: YOUR FAILURE TO RECORD ANOTICEOF�� � COMMENCEMENT MAY RESULT IN YOUR
<br /> � TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
<br /> IrOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br /> - -
<br /> OR AGENT 60 ,/ CONTRACTOR
<br /> Notary Public
<br /> afy Public
<br /> Co
<br /> ___
<br />
|