PGT Industries,Inc..
<br /> NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br /> A. DRAWINGS
<br /> 11 Manufacturer's die drawings and sections.
<br /> (Submitted under NOA No.15-0903.10)
<br /> 2. Drawing No. MD-HR5510-01 titled "Horizontal Roller - LM", sheets 1 through 18 of
<br /> IS, dated 05115115, with revision B dated 03/27/17, prepared by manufacturer, signed
<br /> and sealed by Anthony Lynn Miller, P.E.
<br /> B. TESTS
<br /> 1. Test reports on: 1)Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
<br /> 2)Large Missile Impact Test per FBC, TAS 201-94
<br /> 3) Cyclic Wind Pressure Loading per FBC, TAS 203-94
<br /> along with marked-up drawings and installation diagram of a PVC sliding glass door,
<br /> a PVC fixed window and an aluminum sliding glass door, using: Kodispace 4SG TPS
<br /> spacer system, Duraseal® spacer system, Super Spacer NXTTM spacer system and XL
<br /> EdgeTM spacer system at insulated glass,prepared by Fenestration Testing Laboratory,
<br /> Inc., Test Reports No. FTL-8717, FTL-8968 and FTL-8970, dated 11/16/15,
<br /> 06/07/16 and 06/02/16 respectively, all signed and sealed by Idalmis Ortega, P.E.
<br /> (Submitted under previous NOA No. 1 6-0714.17)
<br /> 2. Test reports on: 1)Air Infiltration Test,per FBC, TAS 202-94
<br /> 2)Uniform Static Air Pressure Test, Loading per FBC TAS 202-94
<br /> 3)Water Resistance Test,per FBC, TAS 202-94
<br /> 4)Forced Entry Test,per FBC 2411.3.2.1, and TAS 202-94
<br /> 5) Large Missile Impact Test per FBC,TAS 201-94
<br /> 6) Cyclic Wind Pressure Loading per FBC, TAS 203-94
<br /> along with marked-up drawings and installation diagram of series 5410 and series
<br /> 5510 PVC horizontal sliding windows,prepared by Fenestration Testing Laboratory,
<br /> Inc., Test Report No. FTL-8072, dated 02/03/15, signed and sealed by Idalmis Ortega,
<br /> P.E.
<br /> (Submitted under NOA No.15-0903.10)
<br /> 3. Test reports on: 1)Air Infiltration Test,per FBC, TAS 202-94
<br /> 2)Uniform Static Air Pressure Test,Loading per FBC TAS 202-94
<br /> 3)Water Resistance Test,per FBC,TAS 202-94
<br /> 4)Forced Entry Test,per FBC 2411.3.2.1, and TAS 202-94
<br /> 5)Large Missile Impact Test per FBC, TAS 201-94
<br /> 6)Cyclic Wind Pressure Loading per FBC,TAS 203-94
<br /> along with marked-up drawings and installation diagram of series 5510 PVC
<br /> horizontal sliding windows, prepared by Fenestration Testing Laboratory,Inc., Test
<br /> Report No. FTL-8073, dated 02/18/15, signed and sealed by Idalrnis Ortega, P.E.
<br /> (Submitted under NOA No.15-0903.10)
<br /> Jorge M.Plasencia,P.E.
<br /> Pr uct Control Unit Supervisor
<br /> NOA No. 17-0411.08
<br /> Expiration Date: September 24,2020
<br /> Approval Date: August 31,2017
<br /> E-1
<br />
|