Laserfiche WebLink
4 <br /> 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.C. <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet-around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping ,h inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the.water heater to a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.Q. <br /> 26. A copy of the enemy eacls shall be with permit at all dines.- <br /> 2 7. Copy of final insulation report shall be provided with permit before iinaL <br /> 28. No fence, pool or screen enclosure :is issued with this permit. <br /> F.F.E.-Finished Floor Elevation <br /> RB.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />