Laserfiche WebLink
7 <br /> 23, Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-. 14403.5.3Hot water pipe insulation. <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping-1;inch (1.9.1 mm)and larger in nominal diameter.. <br /> Piping:serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to.a distribution manifold: <br /> .Piping located under a floor slab. <br /> Buried.:in piping, <br /> Supply and return piping in recirculation-systems other than demand'recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26 A cony of the energy caclsshall be with permit at all times <br /> 27. Cony of Awl insulation report shall be provided ivith Permit before rinaL <br /> 28.-No fenee,pool or screen enclosure :is issued with:this Permit <br /> RRE.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act- N.E.C.-National Electric Code(2016) <br /> i <br />