Laserfiche WebLink
4' <br /> ® c <br /> r' ) 1800 W Ashton Blvd. <br /> vivi ® • ' Lehi, SIT 84043 <br /> Structural Group <br /> J. Matthew Walsh, PE Samuel Brown, PE-Civil <br /> Senior Structural Engineering Manager Structural Engineering <br /> james.waishC vivintsolar.com sam.brown0vivintsolancom <br /> May 02,2019 <br /> Re: Structural Engineering Services <br /> Beatty Residence <br /> 6671 Wagon Trail St, Zephyrhills, FL <br /> S-6099087; FL-01 <br /> To Whom It May Concern: <br /> We have reviewed the following information regarding solar panel installation on the roof of the above referenced <br /> home: <br /> 1. Site Visit by a representative from our office under my supervision identifying specific interior and <br /> exterior site information including the condition of the existing roof system and the size, spacing, and <br /> condition of existing structural framing members. Information gathered during the site visit includes <br /> photographs, sketches, and verification forms. <br /> 2. Design drawings of the proposed PV System layout, including details to mount the new solar panels to <br /> the existing roof. <br /> Based on the above information,we have evaluated the structural capacity of the existing roof system to support the <br /> additional loads imposed by the solar panels and have the following comments related to our review and evaluation: <br /> A. Description of Residence: <br /> The existing residence is typical wood framing construction with a maximum of two layers of composite shingle <br /> roofing. All wood material utilized for the roof system is assumed to be Southern Pine#2 or better with standard <br /> construction components and consists of the following: <br /> • Roof Sections: Prefabricated trusses at 24" on center. Survey photos indicate that there was free <br /> access to verify the framing size and spacing. <br /> B. Loading Criteria ALL WORK SHALL COMPLY WITH PREVAILING <br /> CODES FLORIDA BUILDING CODE, <br /> 8.02 PSF= Dead Load (roofing/framing) NATIONAL ELECTRIC CODE, <br /> 2.59 PSF= Dead Load (solar panels/mounting hardware) AND THE CITY OF ZEPHYRHILLS <br /> 10.61 PSF=Total Dead Load ORDINANCES <br /> 20 PSF= Roof Live Load (based on local requirements) <br /> Wind speed of 145 mph (based on Exposure Category D-the tcit`�`"'(l A�Vgjg�tagwin ILA is calculated for the <br /> Interior, Edge, and Corner Zones of the dwelling.) CI�- d 'r�_. �'' <br /> 4`5� ZCj:�H)"-R <br /> C. Solar Panel Anchorage <br /> )��l_ <br /> 1. Installation shall proceed in accordance with the applicable guidelines and r2b)mmen atons-indicated below. <br /> If, during solar panel installation, the roof framing members appear unstable deflect non-uniformly, our office <br /> should be notified before proceeding with the installation. <br /> • EcoFasten Solar Installation Manual, which can be found on the EcoFasten Solar website <br /> (www.ecofastensolar.com). <br /> 2. The solar panels are 1 Yz' thick. At no time will the panels be mounted higher than 10" above the existing <br /> surface of the roof. <br /> Page 1 of 2 IL Nto <br />