Laserfiche WebLink
Additional Services <br /> • Required Drain Line-Reuse Existing Required Drain Line-Reuse Existing <br /> Drain Line Clean With Drain Line Drain Line Clean With Drain:Line <br /> Cleaner Cleaner . <br /> • Required Indoor Unit-Horizontal Air Required Indoor Unit-Horizontal Air <br /> Handier In Attic Handler In Attic <br /> • Required Permits.-Electrical Permit • Required Permits-Electrical Permit <br /> Included if Electrical done by Del-Air Included if Electrical done by.Del-Air <br /> • "Required Outdoor Breaker.Brand- • Required Outdoor Breaker Brand- <br /> Existing Indoor Unit Breaker Brand . Existing Indoor Unit Breaker Brand <br /> Siemens Siemens <br /> • Required Outdoor Breaker Existing • Required Outdoor Breaker Existing <br /> Size-Existing 30 Amp Outdoor Size-Existing 30 Amp Outdoor <br /> Breaker Breaker <br /> •,'Required Indoor Breaker Brand_- • .Required Indoor Breaker Brand- <br /> Existing Indoor Unit Breaker Brand Existing Indoor Unit Breaker Brand <br /> Siemens Siemens <br /> • "Required,Indoor Breaker Size-< Required Indoor Breaker Size- <br /> Existing 50 Amp"Indoor Breaker Existing 50 Amp Indoor Breaker <br /> Included Material-Included-Clean Included Material-Included-Clean <br /> Work Area At Job Completion ., - Work Area At Job Completion <br /> ;Included Material-Included-Dispose • Included Material-Included-Dispose <br /> Of Old Equipment Of Old Equipment <br /> .' Included Material-Included-New Included Material-Included-,New <br /> Code Approved Hurricane Straps Code Approved Hurricane Straps <br /> • Included Material—Included-New • Included Material-Included-New <br /> Galvanized Seconday Drain Pan Galvanized Secondary Drain Pan <br /> Included Material-Included-New In- . Included Material-Included-New In- <br /> Line Safety Float Switch Line Safety Float Switch <br /> •. Included Material-Included-New Pan • Included Material-Included-New Pan <br /> Safety Float Switch Safety Float Switch- <br /> Included Material=Included-Permit. Included Material-Included-Permit <br /> Included Material-Included- Included Material-Included- <br /> Reconnect&Clean.Existing Drain.Line, Reconnect&Clean Existing Drain Line <br /> • Included Material-Included- • Included Material-Included _ <br /> Reconnect Existing Return Duct to Reconnect Existing Return Duct to <br /> New Unit using 1-112"Antimicrobial. New Unit using 1-1/2"Antimicrobial <br /> Insulation Insulation <br /> Included Material.-Included- Included Material-'Included- <br /> Reconnect Existing Supply Plenum to_ Reconnect Existing Supply Plenum to <br /> New Unit using'l-1/2"Antimicrobial New Unit using 1-1/2"Antimicrobial <br /> Insulation Insulation <br /> • Extended Warranty-2nd Year Labor . Extended Warranty-2nd Year Labor <br /> Warranty Warranty <br /> Outdoor Unit-New Hurricane Rated Outdoor Unit-New Hurricane Rated <br /> Condenser-Pad 40 X 40(H022745) Condenser Pad 40 X 40(H022745) <br /> Option 2 Total Investment <br /> w Total:$5,774 Total:$6,456 <br /> Estimated Payment:$320.78 Estimated Payment:$358.67 <br /> Payment:Synchrony(253)18 Month No Payment:Synchrony(253)18 Month No <br /> Interest with Monthly Payments Interest with Monthly Payments <br /> Option,2 After Rebate <br /> ,Total:$5,774 Total:$6,456 <br /> Duke Energy,Rebate:$200 Duke Energy Rebate:$200 <br /> Net:$5,574 Net:$6,256 <br /> May 2, 2019 9:32:14 AM Page 2 of 4 <br />