My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21326
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:19:01 AM
Creation date
1/8/2020 1:37:41 PM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-21326
Building Department - Name
POWELL,JODEEN TIANN
Address
6581 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e ' <br /> s <br /> vivi nt® so I a 3 1800 We shUT 84043 <br /> Structural Group <br /> J.Matthew Walsh,PE Samuel Brown, PE-Civil <br /> Senior Structural Engineering Manager Structural Engineering <br /> james.walshLa)vivintsolar.com sam.brown@)vivintsolancom <br /> May 13, 2019 <br /> Re: Structural Engineering Services <br /> Powell Residence <br /> 6581 Wagon Trail St, Zephyrhills, FL <br /> S-6110486; FL-01 <br /> To Whom It May Concern: <br /> We have reviewed the following information regarding solar panel installation on the roof of the above referenced <br /> home: <br /> 1. Site Visit by a representative from our office under my supervision identifying specific interior and <br /> exterior site information including the condition of the existing roof system and the size, spacing, and <br /> condition of existing structural framing members. Information gathered during the site visit includes <br /> photographs, sketches, and verification.forms. <br /> 2. Design drawings of the proposed PV System layout, including details to mount the new solar panels to <br /> the existing roof. <br /> Based on the above information,we have evaluated the structural capacity of the existing roof system to support the <br /> additional loads imposed by the solar panels and have the following comments related to our review and evaluation: <br /> A. Description of Residence: <br /> The existing residence is typical wood framing construction with a maximum of two layers of composite shingle <br /> roofing. All wood material utilized for the roof system is assumed to be Southern Pine#2 or better with standard <br /> construction components and consists of the following: ; <br /> • Roof Section: Prefabricated trusses at 24" on center. Survey photos indicate that there was free access <br /> to verify the framing size and spacing. <br /> B. Loading Criteria <br /> 8.02 PSF= Dead Load (roofing/framing) <br /> 2.59 PSF= Dead Load (solar panels/mounting hardware) <br /> 10.61 PSF=Total Dead Load <br /> 20 PSF= Roof Live Load (based on local requirements) <br /> Wind speed of 145 mph (based on Exposure Category D-the total area subject to wind uplift is calculated for the <br /> Interior, Edge, and Corner Zones of the dwelling.) <br /> C.Solar Panel Anchorage <br /> 1. Installation shall proceed in accordance with the applicable guidelines and recommendations indicated below. <br /> If, during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office <br /> should be notified before proceeding with the installation. <br /> • EcoFasten Solar Installation Manual, which can be found on the EcoFasten Solar website <br /> (www.ecofastensolar.com). <br /> 2. The solar panels are 1 Yz" thick. At no time will the panels be mounted higher than 10" above the existing <br /> surface of the roof. <br /> Page 1 of v i v i n 0, <br /> 1, <br />
The URL can be used to link to this page
Your browser does not support the video tag.