Laserfiche WebLink
i <br /> 23. Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N:E.0 <br /> 24. In accordance with the Land Development Code,lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot Water'pipe insulation.' <br /> Insulation for hot water.•pipe with-a minimum thermal resistance (R-value) of R-3.shall.be applied to the <br /> following: <br /> Piping 31. inch (1.9.1 mm) and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space.. <br /> Piping from the.water-heaterto a distribution manifold.- <br /> Piping.located under,a floor slab: <br /> Buried in piping.. <br /> Supply and return piping in recirculation systems other than demand recirculation systems, <br /> 25.Blower door test shall be provided before C.O: <br /> 26.A copy of the energy:eacls'shall be:with at all times. <br /> 27. Copt/of fnal."insulation report shaft be provided with permit before frnaL <br /> 28. No fence,pool or screen enclosure :is issued with:this permit <br /> F.F.E..-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br /> i <br /> j <br />