Laserfiche WebLink
�3. Tamper- Resistant Receptacles in accordance with 406.11 of the-2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots_ shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> insulation for hot water-pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 314 inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit: <br /> Piping located outside the conditioned space:. <br /> Piping from the water heaterto a distribution manifold. <br /> Piping.located under'a floor'slab.. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided Before C.O: <br /> 26.A copy ofthe energy cacls shall be with permit at all times. <br /> 27. Copy of final.insulation reportshallbe provided with permit-before rtnaL <br /> 28 No fence, pool or screen enclosure is issued with:this.permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C= Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />