My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21353
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 2:05:45 PM
Creation date
1/8/2020 2:05:44 PM
Metadata
Fields
Template:
Building Department
Company Name
WACHOVIA BANK C/O THOMAS REUTER
Building Department - Doc Type
Permit
Permit #
19-21353
Building Department - Name
WACHOVIA BANK C/O THOMAS REUTER
Address
5230 6TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMFORT <br /> SYSTEMS e <br /> Quality People.Building Solutions <br /> INTRACOMPANY PROJECT MEMORANDUM OF AGREEMENT <br /> Agreement made as of the 31d day of April 2019 <br /> Between Comfort Systems USA, Strategic Accounts <br /> (Division of Comfort Systems USA) <br /> 2655 Fortune Circle West Suite E <br /> Indianapolis, IN 46241 <br /> And Operating Company: CSUSA BCH Consery - <br /> 8633 Elm Fair Blvd. <br /> ' Tampa, FL' 33610 <br /> For this project: <br /> Wells Fargo/BE#143527 Project No. C90081 <br /> 5230 6th Street PO#C90081001 <br /> Zephyr Hills, FL 33541 BE#143527 <br /> I. SCOPE.OF WORK: <br /> Provide equipment, labor and materials to replace HVAC equipment per proposal (Exhibit A). <br /> Included in this scope of work is the following as it applies: <br /> Operating Company shall coordinate all work with store manager each day. <br /> • Operating Company is responsible to verify equipment nameplate, specifications and voltage at <br /> delivery. Wrong equipment accepted by the Operating Company shall not be considered a change <br /> order. <br /> • All crane/helicopter cost and scheduling-will be the responsibility of the Operating Company. <br /> • Operating Company shall provide all necessary permits and inspections per local,and state codes. If a <br /> permit is not required, please provide a written statement indicating that permits are not required. <br /> • All mc6rinections of existing.duct work and controls are the responsibility of the Operating Company. <br /> • All utility reconnections, gas, electric, and condensate piping will be the responsibility of the , <br /> Operating Company. <br /> • Curb adaptor(s)shall be single stacked and fastened to roofed-in curb. Double stacking of curb <br /> adaptors is prohibited. <br /> • Equipment and curb adapters will be received at Operating Company's location or crane yard <br /> (Equipment should not be staged or stored on roof of location). <br /> • Completion time on the project is of the essence Es . <br /> • Operating Company shall qualify Energy Management System (EMS)as per customer requirements. <br /> • Operating Company shall provide all smoke detectors as required by local code(s)and fire marshal. <br /> • Units shall be commissioned per factory standards, Et according to manufacturer specifications. <br /> • Operating Company shall provide EPA Record Maintenance documentation. Scope includes recovery of <br /> refrigerant from unit and disposal as per EPA regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.