Laserfiche WebLink
23..Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.31-lot water pipe insulation <br /> insulation for hot water pipe with a minimum thermal resistance(R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31, inch (16.1 mm) and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold. <br /> Piping.located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A copy of the energy.cacls shall be with permit at all times. <br /> 27 CopV of final insulationz report shall be provided ivith permit before rnaL <br /> 28.No fence,pool or screen enclosure is issued with.this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6"'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />