Laserfiche WebLink
23. Tamper- R6sistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5,3Hot water pipe insulation <br /> Insulation ati.on for hot Water pipe With a minimum th,er.mal resistance (R-value) of R-3 shall be applied to the <br /> f.011o'wi ng: <br /> Piping V inch (1.9.1 mm)and larger in nominal diameter. <br /> Piping serving more than one.dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to.a distribution mEinifold-. <br /> Piping Iodated under.floor slab. <br /> Buried in piping, <br /> Supply.and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blow" '-eir door test shall be provided befbre.C.O: <br /> 26.A copy of the enemy cacls shall be with permit at all times. <br /> 27, CopV,of floal insulation re,06it shall be provided with permit before rinaL <br /> 28. No fence,Pool or screen enclosure e is issued with:this.permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />