Laserfiche WebLink
21 Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. n accordance with the Land Develop_merit Code,lots shall be sodded before final at least 10, <br /> feet around the structure. <br /> 25:.R403.5.3Hot water pipe-insulation <br /> Insulation for hot.water'pipe with-a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping,3/<inch (1.9.1 mm) and larger in.nominal diameter. <br /> Piping.serving more than:one dwelling unit. <br /> Piping located,outside the conditioned space. <br /> Piping from the water heater to:a-distribution manifold._ <br /> Piping.located under a floor-slab. <br /> Buried in piping,' <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A copy of the energy cacls shall be with-permit at all times <br /> 27. Copy of final insulation report shall-be provided with permit before fnab <br /> 28:No fence, pool or screen enclosure :is issued with:thispermit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />