NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subjectto"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for'compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner"has-hired' a contractor or
<br /> contractors to undertake work, they may be required to be licensed-in accordance with state and local regulations; .,1f the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for 9 misdemeanor violation
<br /> under state law. If the-owner or intended contractor are uncertain as to,what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division- Licensiin6 Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors,, he is advised to have the contractor(s).sign
<br /> portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION I'MPACTIUTILITIES IMPACT AND RESOURCE�RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change'of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands,:that such fees, as may be due, will be identified at the time of
<br /> permitting. It is further understood that,Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "certificate of occupancy" or final power release. If the.project does not involve a certificate of occupancy-or
<br /> final power release, the fees must be.paid prior to permit issuance. Furthermore, if.Pasco County Water/Sewer Impact
<br /> fees are due, they,must-be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is$2,500.00 or more, I
<br /> certify that 1, the applicant, have been provided-with a copy of�the "Florida Construction,Lien Lava—Homeowner's
<br /> Protection.Guide",prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicalptis someone
<br /> other than the"owner", I certify that I have obtained a copy of the above.de'scribed document and promise in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the,information in this application is accurate and thatt-all work
<br /> will be done in compliance with 911 applicable,laws regulating construction, zoning and land development. Application, is
<br /> hereby made to obtain a permit to do work''and 'Installation as indicated. I certify that no work or installation has
<br /> commenced prior to.issuance.of a-permit and that all work will be,performed to .meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction.. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigabld Waterways.
<br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways, _
<br /> I understand that the-following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone W"unless expressly permitted.
<br /> - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem "wall
<br /> construction, I certify that fill will be used only to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties;,the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated.by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the.-owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing,,signs, wells, pools, air conditioning, gas, or other installations not,specifically included in the-application. A
<br /> permit issued shall be construed to be a license to proceed with,the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued-shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized.by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is-commenced. An extension
<br /> may be requested, in writing,.from the Building Official fora period not to exceed ninety(90) days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety'(90)consecutive days,the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN'YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY.' IF YOU-INTEND TO OBTAIN FINANCING,CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF'COMMekCEMENT:
<br /> FLORIDA JURAT(F.S.117.03}
<br /> OWNER OR AGENT r\,a CON 7 A
<br /> Jb ' a and sworndd(o� need)`b-efore m'JfffE- Subscr bed m tn
<br /> 0 1affI?i�ted)b- eefdrth
<br /> by —rT
<br /> s 5T6F _R
<br /> KNr
<br /> ol rep rsodlyk 8rhas)ha%Ae l5rddu V Lo' Who I re ly k fiVrf%or ftsfhVve;TmdbcW
<br /> '0BV2,!!7 4( , as Identification.
<br /> as identification.
<br /> Notary Public Notary Public
<br /> Commission No. Commission No.
<br /> Name f
<br /> Name of Notary typed,printed or stamped
<br /> Corrunlsslori#(11334 6276
<br /> -.V Expires June 18.2023 CARLOS MALDONADO
<br /> 0 Dm-nt
<br /> C0MMiss10n#GAS 346275
<br /> ...... Expires June 18,2023
<br /> BmdodTh,TroyFaln1ftsuMft0800,3&
<br />
|