Laserfiche WebLink
STATi V_UMN'S_E$• FL EC13.006590'GA EN213455`• <br /> 12) Genset enclosure UL site evaluation and/or testing; <br /> 13) IBC,or seismic compliance and/or calculations; <br /> 1.4)• Equipment-performance beyond•manufacturer's design; <br /> B) Third party electrical apparatus testing%inspections; <br /> 16) Specialty testing(emissions,.noise;harmonics,etc. <br /> 17) Utility Company Fees. This wduld include_relocation of existing Building Transformers. <br /> Fees; <br /> Furthermore,the following information may clarify and assist in better understanding our Scope of Work. <br /> 1. Clean up for debris created by our work force will be collected daily and placed in an on-site <br /> dumpster provided by-others. <br /> 2. If selected-as contractor for this project,our contract must include by reference this scope of work. <br /> with negotiated modifications,.if any. Further, we reserve the right to review and negotiate the <br /> general conditions bf the contract. <br /> 3. All work shall'be completed during normal business Hours, with the exception of the work' <br /> associated with the feeders to the 31 floor. <br /> 4. Other than paining it is the intent of this proposal to be a turn-key project. <br /> All of our work:is guaranteed for one-,year. Due to the fluctuating cost of equipment and available staffing; <br /> this price proposal is only valid for 30 working days from-the date of this proposal. <br /> Base-Price ..............:..:::..:.:............ $267545:00 <br /> Sincerely; AHS <br /> DD '� By: <br /> Daniel A.Thompson <br /> Estimator/Project Manager <br /> CC: Julius Davis;CEO <br /> Maurice Perez,WP CL <br /> Larry Pasetti,Project Manager Print Name and Title <br /> Jim Ehlers,Director of Electrical Services <br /> Date <br /> VOLT*R1'R <br /> CONSTRUCTORS Page 3 of-3 <br />