Laserfiche WebLink
i <br /> STATE LICENSES'FL EC13006590 GA EN213455 <br /> i) Start-up <br /> 5) Automatic Transfer Switches-NEMA 311,sizing per facility; <br /> 6) ATS Standard Transition: <br /> 7) Manufacturer's Basic One(1)Year Limited Warranty; <br /> 8) All modifications to existing feeders as coordination per walk through; <br /> 9) Equipment and materials supplied being warranted only to the extent that the same are <br /> warranted by the manufacturer, <br /> 10) Additional Switchgear Package in-accordance with the coordination per walk through; <br /> 11) Existing building switchgear to remain and re-utilized; <br /> 12) New feeders to be compact Aluminum conductors; <br /> 13) Saw butting and patch back of asphalt aftd concrete; <br /> 14) Fire Stopping of penetrations made during scope of work; <br /> 15) Labeling per Code; <br /> 16) Hand dug trenching; <br /> 17) Concrete Housekeeping pads; <br /> 18) ACHA engineering requirements,documents and construction requirements; <br /> 19) Backup Generator rental'during installation period and change over. <br /> 20) Fuel Allowance of$2,000.00 for each individual site generators. <br /> 20 Electrical Permit; <br /> Zephyr Haven Health and-'Rehab Building 2 (400 kW•Generator) <br /> • Generac SD400-(Sized to be confirm once utility PkWD is provided by client) <br /> •• LI Enclosure/FDPR/HVHZ <br /> e 96hr Capacity Fuel tank(shipped under a vacuum) <br /> • Line adder for stairs and platforms <br /> • .HVHZ rated drop-over for 1000A&600A SE rated ATS <br /> Price does not include-> <br /> 1} Correcting any exisitng Code violations that might be present, such corrections shall be <br /> documented and completed on a Time&Material Basis, <br /> 2) Backup Generator fuel; <br /> 3) Post Installation Load Bank Test on Gen-Set; <br /> 4) Restoring any indoor or outdoor areas to its original or new finish; <br /> 5) Supplying and installing a Lightning Protection System or components; <br /> 6) Liability for indirect loss or damage; <br /> 7) Price excludes overtime installation(work after 4:30 pm Monday—Friday,weekends, or <br /> holidays). <br /> 8) Tank breach of integrity test after installation(by Yd party) <br /> 9) Buyer referenced government requirements; <br /> 10) Missile impact rated Genset enclosure; <br /> 11) Genset enclosure wind-loaded P.E.calculations; <br /> 12) Genset enclosure UL site evaluation and/or testing; <br /> 13) IBC or seismic compliance and/or calculations; <br /> VOUT*RWR <br /> CONSTRUCTORS Page 2 6(3 <br />