Laserfiche WebLink
Post Construction 6.7.2.2 Mechanical Furnished O&M manuals for HVAC systems <br /> within 90 days of system acceptance. <br /> Post Construction 6.7.2.3 Mechanical An air and/or hydronic system balancing report is <br /> provided for HVAC systems serving zones>5,000 <br /> ft2 of conditioned area. <br /> HVAC 6.7.2.4 Mechanical HVAC control systems have been tested to El El El <br /> ensure proper operation,calibration and <br /> adjustment of controls. <br /> Post Construction 8.7.1 Interior Lighting Furnished as-built drawings for electric power 1:1 El El <br /> systems within 30 days of system acceptance. <br /> Post Construction 8.7.2 Interior Lighting Fumished O&M instructions for systems and El <br /> equipment to the building owner or designated <br /> representative. <br /> EnergyGauge Summit®Fla/Com-2017.TAM 2017-1.0 Compliant Software. Effective Date:Dec 31,2017 <br /> Florida Building Code,Sixth Edition(2017)-Energy Conservation ASHRAE 90.1-2013-Prescriptive Compliance Option <br /> 7/6/2018 Page 15 of 21 <br />