My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20607
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 1:57:32 PM
Creation date
1/13/2020 1:57:31 PM
Metadata
Fields
Template:
Building Department
Company Name
HIDDEN RIVER
Building Department - Doc Type
Permit
Permit #
18-20607
Building Department - Name
LENNAR HOMES LLC
Address
2964 MOULDEN HOLLOW DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
When Buildings Talk,M Listen. <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING <br /> CONSTRUCTION <br /> Envelope Leakage Test Report <br /> Prescriptive and Performance Method <br /> Project Name: Wddeiq Tivev Builder Name:I pnrl q( <br /> Street: MoQ1,V) 4M,-D( Permit Office:C11-, CP Ze�a r/,/,/,s <br /> y <br /> City, State,Zip: �f Permit Number: 0-7 <br /> Design Location: G Jurisdiction: &// &06 <br /> Square Feet: q 5C Conditioned Volume: /6, <br /> 0 <br /> Envelope Leakage Test Results <br /> Single Point Test Data: <br /> HOUSE PRESSURE: — 50 FLOW: 139 7. <br /> Leakage Characteristics <br /> CFM (50): 1570 Pass FIFail <br /> ACH(50): <br /> R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding Tair <br /> changes per hour in Climate Zones I and 2 ... Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 <br /> Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals <br /> licensed as set forth in Section 489.105(3)(f), (g), or (1) or an approved third party, A written report of the results of the test shall be <br /> signed by the party conducting the'test and provided to the code official. Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other <br /> infiltration control measures; <br /> 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended <br /> infiltration control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off,and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open <br /> I hereby certify that the above envelope leakage Where required by'the code official, testing shall be <br /> performance results demonstrate, compliance with conducted by an approved third-party. A written report of <br /> Florida Energy Code requiremels in agcordance with the test results shall be signed by the third party <br /> 0� <br /> section R402.4.1. conducting the test and provided to the code official. <br /> SIGNATURE: <br /> PRINTED NAME/.1424M BUILDING AL: <br /> DATE: DATE- <br />
The URL can be used to link to this page
Your browser does not support the video tag.