Laserfiche WebLink
imA V7 <br /> L"L= • <br /> When Buildings Talk,We Listen. <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING <br /> CONSTRUCTION <br /> Envelope Leakage Test Report <br /> Prescriptive and Performance Method <br /> Project Name: OJI, 'F,-vzv Builder Name: L9-r?y7q1 <br /> Street: 2.456 Moql�,i 4d1,wV(t've Permit Office: Cry CP zee ll, (h,//s <br /> City, State, Zip: 7—cpA (41`11SIFZ( 5350 Permit Number: 20�'0 <br /> Design Location: 5 Jurisdiction: Cp11&V0 <br /> Square Feet: IqL30, Conditioned Volume: l(�, <br /> Envelope Leakage Test Results <br /> Single Point Test Data: <br /> 50- FLOW- <br /> 1 2- <br /> HOUSE PRESSURE: - <br /> Leakage Characteristics <br /> E7JPass <br /> F]Fail <br /> CFM (50): 9 &Pcp <br /> ACH(50): <br /> R402.4.1.2 Testing. The building or dwelling Unit shall be tested and verified as having an air leakage rate of not exceeding 7 air <br /> changes per hour in Climate Zones I and 2 ... Testing shall be conducted with a blower door at a pressure of 0.2 inches W,d. (50 <br /> Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or Individuals <br /> licensed as set forth in Section 4$9.105(3)(f), (g), or(1) or an approved third party. A written report of the results of the test shall be <br /> signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other <br /> Infiltration control measures; <br /> 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended <br /> Infiltration control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open <br /> 1 hereby certify that the above envelope leakage Where required by *the code official, testing shall be <br /> performance results demonstrate complia ce with conducted by an approved third-party. A written report of <br /> Florida Energy Code equire n acc• e with the test results shall be signed by rthe third party <br /> section R402.4.1. conducting the test and provided to the code official, <br /> SIGNATURE <br /> PRINTED NAME uVLAJ-4,J 6nj-�o, ElUILDING-OFF11911AL)i <br /> DATEt Oq 1 a:�2 DATE: <br />