Laserfiche WebLink
813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 <br /> Building Department <br /> Date Received <br /> Phone Contact for Permitting <br /> Owner's Name / )/ 1 /�t%�— {.-'�', rl� Owner Phone Number 3C/ -311 J ,fir <br /> Owner's Address <���ffl�/ ,' r`1il),�� 4-R-� Owner Phone Number <br /> Owner Phone Number <br /> 1 C 1 <br /> JOB ADDRESS LOT# c'= <br /> v - <br /> SUBDIVISION rll .°;! / C' !'c .' �; PARCEL ID# <br /> (OBTAINED FROM PROPERTY TAX NOTICE) <br /> WORK PROPOSED e NEW CONSTR e ADD/ALT 0 SIGN DEMOLISH <br /> INSTALL REPAIR <br /> PROPOSED USE 0 SFR Q COMM OTHER I A_IT r] <br /> TYPE OF CONSTRUCTION 0 BLOCK FRAME pp0 STEEL Q <br /> DESCRIPTION OF WORK 6 n: Oft.CF`7' j x r� j <br /> BUILDING SIZE SO FOOTAGE If ram. HEIGHT <br /> =BUILDING $ o VALUATION OF TOTAL CONSTRUCTION <br /> =ELECTRICAL ($ AMP SERVICE 0 DUKE ENERGY Q W.R.E.C. <br /> PLUMBING � <br /> = l <br /> =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION <br /> =GAS 0 ROOFING Q SPECIALTY OTHER <br /> FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO <br /> BUILDER /f�;m ���- c!�l� COMPANY <br /> SIGNATURE REGISTERED Y f N FEE CURREN Y N <br /> Address License <br /> ELECTRICIAN COMPANY <br /> SIGNATURE REGISTERED Y/ N FEE CURREN Y/N <br /> Address License# <br /> PLUMBER COMPANY <br /> SIGNATURE u REGISTERED Y/ N FEE CURREN Y/N <br /> Address License# <br /> MECHANICAL COMPANY <br /> SIGNATURE __ REGISTERED Y/ N FEE CURREN <br /> Address License# <br /> OTHER COMPANY <br /> SIGNATURE REGISTERED Y/ N FEE CURREN Y/N <br /> Address - License# <br /> RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, <br /> Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, <br /> Sanitary Facilities&1 dumpster,Site Work Permit for subdivisionslfarge projects <br /> COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. <br /> Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, <br /> Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance <br /> SIGN PERMIT Attach(2)sets of Engineered Plans. <br /> "PROPERTY SURVEY required for all NEW construction. <br /> Directions: <br /> Fill out application completely. <br /> Owner&Contractor sign back of application,notarized <br /> If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500) <br /> " Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same <br /> OVER THE COUNTER PERMITTING (copy of contract required) <br /> Reroofs if shingles Sewers Service Upgrades A/C' Fences(Plot(Survey/Footage) <br /> Driveways-Not over Counter if on public roadways..needs ROW <br />