Laserfiche WebLink
System Specifications <br /> MECHANICALLY ATTACHED TPO Revised March 2015 <br /> 5. On recover projects,tear off all existing base flashings, cant strips and.projection <br /> flashirip down to the substrate. The flashing substrate shall be dry and tee of <br /> dii,dirt,-grease,sharp edges;and debris. <br /> 6. Gravel over existing nailers must be totally removed prior to installing new nailers <br /> and flashin6s. Verify that the existing nailers are in good condition and securely <br /> an6hofed to the roof decks. <br /> 7. When an additional thickness of insulation is being added, new nail6rs,must be <br /> added to matcli the height of the new insulation. Nailets'must be securely <br /> anchored to the roof,deck-per Section 3.0t of this specificatlon. <br /> 8. All roof surfaces shall be free of poncled water, ice,or snow; Sig.nificant,ponding <br /> that remains after a period of 48 hours should be eliminated by either installing <br /> tapered insUlatioh to create p6sitive.draina06 of the roof surface or by installing <br /> 60 W'dtains in the 16W areas where the lJonding remains. Positive drainage shall <br /> also ellihihate the possibility of excatisiVe live logdt caused by p6hding water that <br /> could cause structural damage or failure. <br /> 9. When removing an existing roof during reroofing, remove only <br /> y that amount of <br /> roofing and flashing that can be made watertightwith new Mule-Hide TPO <br /> materials in a onia-d6y period or prior to the onset of inclement weather. <br /> 10. Recovering over a gravel surfaced BUR systems require the installation of an <br /> acceptable insulation. Loose gravel must be removed. All lead pipe and dtain <br /> flashings shall be removed. <br /> 11. Smooth Surfaced BUR and smooth Modified Bitumen roofing systems shall <br /> require t installation of.an,acceptable insulation or sli.psheet All lead pipe and <br /> ALL WORK SHALL COMPLY\'V'TH PF" ivings shall be removed. Single-ply membranes such as EPDM, <br /> Hypalon, PVC or CPA mutt have all existing flashings removed,the field sheet <br /> must be cut up into sections no larger than 10'IYy 10',aild:an acceptable layer of <br /> CODES FLORIDA BUILDING CODE <br /> NA11014AL ELECTRIC CODE, insulation shall be over - e <br /> E C OF ZF th- existing field membrane. <br /> AND T14 CITY P14YRHILLS <br /> ORDINANCES 12. Polyurethane Foam roofing systems("PUF")are not acceptable for recover <br /> applications. The PUF system must be completely removed and new insulation <br /> "Vd prior to the installation of the new TPO Roofing System.. <br /> JAN Voi <br /> Z" 1.7 Mule-Hide Premium warranty is requested,-the existing roof system must be <br /> CITY(jr ZEPHYRHIL— <br /> / emdV6d to the deck prior to the irittallatioh.6f the new roofing system or a <br /> PLANS EX��Pv?,JNEC) <br /> moisture survey by an independent third a <br /> party must b*6 taken,call wet areas <br /> Dyed and,a copy of the survey submitted to Mule-Hide with the Warranty <br /> application.ition. . <br /> 3.04 Vapor Retarder Installation(where.specified) <br /> A. Specific climatic and job conditions may require the use of a vapor retarder. It is the sole <br /> responsibility of tfie.design professional to determine the need for a vapor retarder,and <br /> its-type and location in the r6ofing,system. A vapor retarder may often act as an"air <br /> baim6r"Which may have 6 positivi. effect in reducing internal air pressure. Vapor <br /> retdtdbrs should be strongly considered for building:subject to high internal air pressures <br /> such as airplane hangars and buildings with many loading bays such as warehouse <br /> facilities. <br /> B. The National Roofing Contractor's Association recommends the installation of vapor <br /> retarders when interior relative humidity 19 45%or greater and the outside mean average <br /> January temperature is below-40-F. <br /> Page 14 05-1111 WLE-HIDE PRODUCTS CO.,INC <br />