Laserfiche WebLink
System Specifications <br /> MECHANICALLY ATTACHED TPO Revised March 2015 <br /> 4. Allow-adhesive to dry until it turns yellow and.does not transfer to a dry finger or <br /> pull away from the,substrate. Aqua Base 120 adhesive Will take a longer time to <br /> dry. Adhesive must remain tacky. <br /> 5. Mate surfaces tbQ'et.h6r avoiding wrinkles. Immediately roll the bonded area of <br /> the sheet With 6 2-inch Wide rubber hand roller to promote drsitive <br /> . maximum p <br /> contact between the membrane and the substrate. Overlape all adjacent flashing <br /> sheets a-mi,himi.im of inches. <br /> 6. Do not apply adhesive in area to be heaVwelded. <br /> 7. Extended drying times can be expected during.cool,overcast, humid,shaded,or <br /> late day applications.The adhesive must be dry(Out still tacky)before mating <br /> surfaces to avoid permanent blisters due to trapped moisture. <br /> 8. TPO Membrane Flaphings shall extend a minimum of 6 inches onto the field <br /> sheet and be,adhered securely. ther'e'shall be a' minimum of <br /> f.2-inches_ <br /> hes between <br /> the front of the fastener plates and the edge of the sheet.to allow for heat <br /> Welding. All side- laps are to overlap a minimum of 2 inches. <br /> 9. All flashings shall be extended a-minimum Of.8 inches above roof membrane <br /> level and be terminated uhl6ss pfeviciusly accepted by the owner or his <br /> representative and the,Mu.le I-Hiss <br /> Technical bepArtment. All I flashings shall be <br /> hot air welded at their connections with the roofing membrane. Apply Cut Edge <br /> Sealant at all welded edges of cut membrane flashings. Refer to Mule-Hide TPO <br /> Standard Details for more information. <br /> NOTE: After flashing is adhered in place,*promote full contact adhesion by going <br /> back over entire area with a 2-inch rubber hand roller. <br /> 10. All flashings shall be hot air welded at their connections with the roofing <br /> membrane. All hand welds shall be a minimum of 1-1/2"wide. <br /> 11. All flashings shall be properly terminated according to Mule-Hide's published <br /> Standard Details. <br /> NOTE: When using Mule-Hide AlkPurpose Bar under Couritcirflashingto,terhiinatewall flashing <br /> or when coping.js used,TPO Bonding Adhesive, Low VOC Bonding Adhesive; LoW VOC Bonding <br /> Ing <br /> Adhesive—1168, or Aqua base li6'Bondirig Adhesive may be eliminated when flashing height is <br /> 1Z'-18"or less, depending on the type of termination. Refer to Mule-Hide's published Standard <br /> TPO Details for additional information. <br /> 3.12 Drains,Expansion Joints,Pitch Pans <br /> A. Roof Drains <br /> 1. Prepare the surface around each drain to prevent any distortion,tenting,or <br /> bridging of the membrane. A smooth transition shall be provided from the roof <br /> surface to the suriace of the drain bowl/clam-ping ring. <br /> 2. All existing roofing materials and metal flashings shall'be removed. <br /> 3. Mule-Hide requires the application of one full tube of Water Cut-Off Mastic per <br /> drain applied to.the drain: bowl, under the membrane,where the clamping ring <br /> will be Seated. This will provide a continuous seal between the membrane and <br /> the drain bowl. <br /> 4. Do not run field teams through drains or sumps. If sheet layout causes a seam <br /> to fall.in line with a drain,a target patch (minimum-36"x 36")shall be required. <br /> MULE-HIDE PRODUCTS CO.,INC 05-1111 Page 25 <br />