Laserfiche WebLink
DONNELLY ENGINEERING ELECTRICAL <br /> E. Operations and Maintenance Data: Comply with the manufacturer's instructions for tightening bus <br /> connections, cleaning, operation and maintenance. <br /> 3.3 QUALITY CONTROL <br /> A. General: Field test prior to energization; <br /> 1. Megger check, and record all data, of phase to phase and phase to ground insulation levels. <br /> 2. Continuity. <br /> 3. Proper phase relationship. <br /> END OF SECTION <br /> Heartland Health Care Center of Zephyrhills, FL-3181 16470-4 DE No 217032 <br /> 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 <br />