Laserfiche WebLink
November 29, 2018 <br /> 287.667 Ft Self Support Tower Structural Analysis CC/BU No 816298 <br /> Project Number 9800.816298,Phase 2, Order 468057, Revision 3 Page 10' <br /> Section Component Critical SF"P_allow <br /> Elevation(ft) Size P(K) Pass Fail <br /> No. Type Element (K) Capacity <br /> f 232.583 <br /> T5 232.583- Inner Bracing L4x4xl/4 187 -0.004 9.060 0.3 Pass <br /> 222.166 <br /> T6 222.166- Inner Bracing <br /> 209.583 L4x4x1/4 224 -0.005 7.817 0.4 Pass <br /> T7 209.583-197 Inner Bracing 2L3x2x3/16x5/16 237 -0.166 6.801 2.4 T Pass <br /> T8 197-181.3 Inner Bracing L7x4x3/8 298 -0.011 23.594 0.6 Pass <br /> T9 181.3- Inner Bracing L3 1/2x2 1/2x1/4 333 -0.040 6.079 0.7 Pass <br /> 170.833 <br /> T10 170.833- Inner Bracing L3x3x3/16 394 0.073 6.719 1.1 Pass <br /> 146.75 <br /> T11 146.75- Inner Bracing L5x3xl/4 454 -0.094 7.990 1.2 Pass <br /> 121.667 <br /> T12 121.667- Inner Bracing 2L3 1/2x3 1/2x1/4x5/16 518 -0.014 18.026 0.6 Pass <br /> 96.5843 <br /> T13 96.5843-71.5 Inner Bracing 2L2x2-1/2x3/16x5/16 576 -0.072 8.386 0.9 Pass <br /> T14 71.5-51.417 Inner Bracing 21-2 1/2x2 1/2x3/16x5/16 646 -0.058 7.196 0.8 Pass <br /> T15 51.417- Inner Bracing 21-2 1/2x3xl/4xl/4 721 -0.014 6.862 0.7 Pass <br /> 31.334 <br /> T16 31.334-0 Inner Bracing 21-2 1/2x2 1/2x3/16x5/16 828 -0.078 5.591 1.4 Pass <br /> Summary <br /> Leg(T16) 60.0 Pass <br /> Diagonal 65.0 Pass <br /> (T14) <br /> Horizontal 571 Pass <br /> (T15) <br /> Top <br /> jirt 40.6 Pass <br /> Redund <br /> Horz 1 <br /> Bracing 72.1 Pass <br /> (T14) <br /> Redund <br /> Being 81.5 Pass <br /> (T14) <br /> Redund <br /> Horz 3 18.4 Pass <br /> Bracing <br /> (T16) <br /> Redund <br /> Diag 1 98.0 Pass <br /> Bracing <br /> (T16) <br /> Redund <br /> Diag 2 <br /> Bracing 75.4 Pass <br /> (T16) <br /> Redund <br /> Diag 3 <br /> Bracing 65.8 Pass <br /> (T16) . <br /> Redund Hip <br /> 1 Bracing 1.5 Pass <br /> (T16) <br /> Redund Hip <br /> 2 Bracing 2.0 Pass <br /> (T16) <br /> tnxTower Report-version 8.0.4.0 <br />