My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20818
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 9:56:40 AM
Creation date
1/14/2020 9:56:34 AM
Metadata
Fields
Template:
Building Department
Company Name
GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
19-20818
Building Department - Name
BODRIE,ERNEST & TERESA
Address
7730 KAY MARIE AVE LOT 232
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PGT Industries,Inc. <br /> NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED <br /> A. DRAWINGS <br /> 1. Manufacturer's die drawings and sections. <br /> (Submitted under NOA No.15-0903.11) <br /> 2. Drawing No. MD-BR5410-01 titled "Horizontal Roller - NI", sheets 1 through 15 of <br /> 15, dated 05/15115, with revision B dated 03/27/17, prepared by manufacturer, signed <br /> and sealed by Anthony Lynn Miller,P.E. <br /> B. TESTS <br /> 1. Test reports on: 1)Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94 <br /> 2) Large Missile Impact Test per FBC, TAS 201-94 <br /> 3) Cyclic Wind Pressure Loading per FBC,TAS 203-94 <br /> along with marked-up drawings and installation diagram of a PVC sliding glass door, <br /> a PVC fixed window and an aluminum sliding glass door, using: Kodispace 4SG TPS <br /> spacer system,Duraseal® spacer system, Super Spacer®NXTTM spacer system and XL <br /> EdgeTM spacer system at insulated glass, prepared by Fenestration Testing Laboratory, <br /> Inc., Test Reports No. FTL-8717, FTL-8968 and FTL-8970, dated 11/16/15, <br /> 06/07/16 and 06/02/16 respectively, all signed and sealed by Idalmis Ortega,P.E. <br /> (Submitted under previous NOA No. 16 0714.18) <br /> 2. Test reports on: 1)Air Infiltration Test,per FBC, TAS 202-94 <br /> 2)Uniform Static Air Pressure Test, Loading per FBC TAS 202-94 <br /> 3)Water Resistance Test;per FBC, TAS 202-94 <br /> 4)Forced Entry Test,per FBC 2411.3.2.1, and TAS 202-94 <br /> 5)Large Missile Impact Test per FBC,TAS 201-94 <br /> 6) Cyclic Wind Pressure Loading per FBC, TAS 203-94 <br /> along with marked-up drawings and installation diagram of series 5410 and series <br /> 5510 PVC horizontal sliding windows,prepared by Fenestration Testing Laboratory, <br /> Inc., Test Report No. FTL-8072,dated 02/03/15, signed and sealed by Idalmis Ortega, <br /> P.E. <br /> (Submitted under NOA No. 15-0903.11) <br /> C. CALCULATIONS <br /> 1. Anchor verification calculations and structural analysis, complying with FBC-5rh <br /> Edition (2014) dated 08/28/15'.prepared by manufacturer, signed and sealed by <br /> Anthony Lynn Miller,P.E. <br /> (Submitted under NOA No. 15-0903.11) <br /> 2. Glazing complies with ASTM E1300-09 <br /> D. QUALITY ASSURANCE <br /> 1. Miami-Dade Department of Regulatory-and Economic Resources R). <br /> Jorge M.Plasencia,P.E. <br /> Product Control Unit-Supervisor <br /> NOA No.17-0411.09 <br /> Expiration Date: September 24,2020 <br /> Approval Date: August 31,2017 <br /> E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.