My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20864
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 10:23:51 AM
Creation date
1/14/2020 10:23:50 AM
Metadata
Fields
Template:
Building Department
Company Name
WEDGEWOOD MANOR
Building Department - Doc Type
Permit
Permit #
19-20864
Building Department - Name
WEYGAND,KENNETH W & ALICE
Address
37402 CASTLEBERRY AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lowe's Project Profile Report <br /> EIS' <br /> Project Type: Interiors Customer: Weygand,Alice <br /> Project Subtype: Baths Customer Phone: (813)778-6021 <br /> Store: 1854 Employee: Majirsky,James <br /> Project ID: 7580255 Print Date: 12/6/18 12:16 PM <br /> General <br /> Bath Location Main Level ALL WORK SHALL COMPLY WITH PREVAILINO <br /> CODES FLORIDA.BuILDING CODE, <br /> Bath Type Hall NATIONAL ELECTRIC CODE, <br /> Bath Style Standard Ha"SiffHE CITY OF ZEPHYRHILLS <br /> ORDINANCES <br /> Budget $2,500 or less <br /> REVIEW DATIFhnICL.- <br /> Installation CITY OF ZEPHYR ILLIf <br /> PLANS EXAMINE <br /> Notes: Tub to shower conversion, remove spa tub and cap off <br /> tub faucet line,build new shower floor pan, re-tile walls <br /> to ceiling and re-tile ceiling, bull nose trim, new drain kit, <br /> new shower valve kit,window in side wall will need the <br /> trim and bull nose and new marble sill, build new niche <br /> in back wall,add new 8!'and 16!'grab-bars,new robe <br /> hook,new towel ring, remove spa motor and spa <br /> plumbing,add new glass sliding shower door, new <br /> vanity,CT and low splash(probably in-stock Lowes <br /> vanity),sink,faucet,mirror,and light spray over mirror, <br /> new towel bar,new toilet paper holder, new toilet <br /> (eliminate extended CT over toilet) , new vanity area <br /> floor file,close in medicine cabinet opening,paint walls. <br /> Install a new wet rated LED ceiling light in Master <br /> Shower to replace existing one. <br /> Structural <br /> Notes: Build niche in back shower wall.Close in medicine <br /> cabinet opening. <br /> Vanity/Sink/Top <br /> Notes: new vanity,CT w/low splash,sink,faucet.New mirror. <br /> over vanity <br /> Toilet <br /> Notes: new toilet <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.