Laserfiche WebLink
Neumann Construction&hoofing,LLC <br /> i <br /> MOON ORMA <br /> Roof <br /> DESCRIPTION QTY REMOVE REPLACE ATOTAL <br /> 1. Remove Laminated-comp.shingle rfg.-w/out felt 21.00 SQ 53.94 0.00 1,132.74 <br /> 2. Laminated-comp.shingle rfg.-�v/out felt 25.00 SQ 0.00 176.07 4,401.75 <br /> ( :i. Roofing felt-30 lb. 25.00 SQ 0.00 29.97 749.25 <br /> 4: R&R Drip edge 214.00 LF 0.32 1.79 451.54 <br /> 5'. R&R Ridge cap-metal roofing 70.06 LF 2.08 4.43 455.70 <br /> i 6. R&R Ridge cap-composition shingles 10.00 LF 1.17 2.94 47.10 <br /> 7. R&R Flashing-pipe jack-lead 3.00 EA 6.86 58.22 195.24 <br /> 8. R&R Exhaust cap.-through roof-6"to 8" 1 A0.EA 9.75 66.06 74.75 <br /> 9. Flashing, 14"wide 35.00 LF 0.00 . 2.79 97.65 <br /> 10.. Re-nailing of roof sheathing-complete re-nail 2,450.00 SF 0.00 OA7 416.50 <br /> 11. Taxes,insurance,permits&fees(Bid Item) 1.00 EA 0.00 275.00 275.00 <br /> Totals: Roof 8,297.22 <br /> r <br /> Miscellaneous <br /> DESCRIPTION QTY REMOVE REPLACE *TOTAL <br /> 12. Dumpster load-,Approx.30 yards,5-7 tons of debris 1.00 EA 620.50 0.00 620.50 <br /> i <br /> E Totals: Misecllaneous 620.50 <br /> j Line ltem Totals:llMOON_OR11IA 8,917.72 <br /> i <br /> i <br /> 4 <br /> I <br /> Price is inclusive of sales tax paid at point of purchase <br /> MOON ORMA 2/20/2019 Page:2 <br /> 1 _ • <br /> i <br /> i <br />