Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions" <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance With any <br /> applicable deed restrictions. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or <br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the <br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a.misdemeanor violation <br /> under state law l If the owner-or intended contractor are uncertain as to what licensing requirements may apply for the <br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign <br /> portions'of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the <br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County. <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of <br /> use in existing buildings,.or expansion of existing buildings, as specified in Pasco County Ordinance.number 89-07 and <br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified-at the time of <br /> permitting. It is further understood that'Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a "cerfiIificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or <br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact <br /> fees are due, they must be paid prior to permit.issuance in accordance with applicable Pasco County ordinances. <br /> CONSTRUCTIDN,LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I <br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's <br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone <br /> other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner" prior to commencement. <br /> CONTRACTO R1 SIOWN ERIS AFFIDAVIT: I certify that all the information in this application. is accurate and that all work . <br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is <br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has <br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating <br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also <br /> certify that I understand that the,regulations of other government agencies may apply to the intended work, and that it is <br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: <br /> Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br /> Lands, Water/Wastewater Treatment. <br /> Southwest Florida Water Management District-Wells, Cypress Bayheads; Wetland Areas, Altering <br /> Watercourses. <br /> Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.'. <br /> Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, <br /> • Septic Tanks. <br /> US Environmental Protection Agency-Asbestos abatement. <br /> Federal Aviation Authority-Runways. <br /> understand that the following restrictions apply to the use of fill:- <br /> Use of fill is not allowed in Flood Zone W" unless expressly permitted. <br /> - If the.fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a <br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall <br /> construction, I certify that fill will be used only to fill the area within the stem wall. <br /> If.fill material is to be used'in any area, .1 certify that use of such fill will not adversely affect adjacent <br /> pro��erties. If use.of fill is found to adversely affect adjacent properties, the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1) <br /> acre which are elevated by fill, an engineered drainage plan is required. <br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in <br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, <br /> plumbing, signs wells, pools, air conditioning, gas, or other installations not specifically included in the application. A <br /> permit issued shall be construed to be a license to proceed with the work and not as authority to,violate; cancel, alter, or <br /> 'set aside any provisions.of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter <br /> -----requiring-a-correction_of-errors_in_plans,_construction or violations of any codes. Every permit issued shall become.invalid <br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized-by <br /> the permit.is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension <br /> may be requested,.in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate <br /> justifiable cause for the extension. If work ceases for ninety,(90) consecutive days, th job is considered.abandoned. <br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A'NOTICE OF COMMENCEMENT MAY-RESULT IN YOUR <br /> PAYING-TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT. <br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. <br /> FLORIDA JURAT(FS 1.7.03) <br /> aCONTRACTOR-;. �� VQ IVU� <br /> OWNER OR AGENT_ =1 Iu�O� _ l V L — 1 <br /> SU6 coil a �nd sworep�to(or ' armed berore in th' Sub c ib and sworn t ( a armed b f ore me this <br /> by lid) 0 (UUU a1 �5 by Ml LICE p1GI <br /> 4 [` y <br /> Wh is/are personally kno to me or has/have produced Whd is/a a personally known tome or has/ha a produced <br /> as identification. as Identification. <br /> Notary Public <br /> o a Public <br /> Commission No �Com is on No. <br /> .. i . <br /> Name of Notary typed,printed or stam <br /> Name of Notary ty 'I KELLI B. RYMAN KELLI B. <br /> `.�`o•� °!;'. Commission k <br /> Commission# FF 905017 = FF 90501 7 <br /> •' ,. My Commission Expires <br /> d� My Commission Expires ''•,',4a„pop 1 es <br /> July 30, <br /> July 30, 2019 2019 <br />