My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20880
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 10:54:31 AM
Creation date
1/14/2020 10:54:29 AM
Metadata
Fields
Template:
Building Department
Company Name
DUNE FL LAND I SUB LLC
Building Department - Doc Type
Permit
Permit #
19-20880
Building Department - Name
DUNE FL LAND I SUB LLC
Address
7954 SALI CLOVER LANE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I have a quick question for you. Can we submit building plans for the amenity for a simultaneous review? I understand <br /> you cannot issue a building permit without site plan approval, but I was hoping we could get the building plans reviewed <br /> at the same time. <br /> Thanks, <br /> H A M I LT 0 NI <br /> EN4314E0111N0 d SURVEYING. 111C. <br /> Brad Kuhl,P.E. <br /> Senior Project Manager/Vice President <br /> 3409 W.Lemon Street,Tampa, FL 33609 <br /> c 813.440.7043 1 o 813.250.3535 Ext. 125 <br /> bradk@hamiltonenaineering.us I www.hamiltonenaineering.us <br /> From: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> <br /> Sent:Thursday, February 7,2019 11:31 AM <br /> To: Brad Kuhl<BradK@ ham iltonenginee ring.us> <br /> Cc:Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau<RCorriveau@ci.zephvrhills.fl.us>; Ryan <br /> McCaffrey<RyanM@hamiltonengineering.us>;Sean Oconnor<Sean@metrodevelopmentgroup.com>; Brandy McKown <br /> <BrandvM@hamiltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com> <br /> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD <br /> Good morning Brad, <br /> I have conducted a preliminary review of the Zephyr Lakes Amenity Center Construction Plans and there are several <br /> issues that need to be resolved, preferably, prior to the upcoming Site Plan Review Meeting on Wednesday, February <br /> 20, 2019.The issues are: <br /> 1) Missing landscaping and irrigation plans [so please submit hardcopy and electronic copies of these plans] <br /> 2) The parking stalls/spaces length proposed do not meet the minimum length requirement of 20 feet(LDC <br /> Table 7.03.02) [so please correct this issue] <br /> 3) Missing landscaping islands per a maximum of ten parking spaces (LDC Section 7.06.04.01(C)(7)) [so please <br /> correct this issue] <br /> 4) Missing crosswalk from the Center's front entry walkway crossing to the opposite side of Broad Pointe [so <br /> please add] <br /> In addition, can you give us an update on the plans for the Park areas. <br /> Best regards, <br /> Kevie Defranc <br /> ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY <br /> Kevie Defranc <br /> GIS Technician <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.