My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20969
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 11:45:55 AM
Creation date
1/14/2020 11:45:54 AM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
19-20969
Building Department - Name
REZENTES,THOMAS & HAWLEY,GLORI
Address
3530 ALABASTER DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All lot improvement requests must be submitted no later than Wednesday by 2:00 to be <br /> processed on the following committee meeting day. All permits must be posted visible to the <br /> street. <br /> Date Recd / / LOT IMPROVEMENT REQUEST Permit NOID G2 <br /> To: EPPOA Lot Improvement Committee & Board of Directors <br /> From (please print t!9 Z6-IJ77F5 <br /> Lot#/Address: �` Q // Sr'3C7 AtA [*fis 7t'�� d�JL I <br /> Phone number where you can be reached: 8l� ld� 77d / <br /> We request EPPOA approval for construction, addition to our installation, on the following: <br /> ( ) Shed ( )Lanai ( )RV Port ( )Park Model ( ) Cottage ( )Concrete Slab ( ) Pavers <br /> { ) Concrete Painting ( ) RV Skirting ( ) Landscaping ( )Pet enclosure (tether <br /> All requests for construction/additions/remodeling are required to have a complete, <br /> detailed/sketch, to include footprint, setbacks, front elevation, back elevation, left a <br /> right side elevation and top elevation. All elevations must include all sizes and <br /> locations of windows and doors, with length, width and height ofithe overall structure. <br /> Park models are to include pamphlet with pictures. In addition, all requests require and <br /> must include the full description, including color of siding, trim, shutters, doors, pavers <br /> and concrete painting if applicable. "PRIOR TO BEGINNING CONSTRUCTION" a copy of the <br /> Zephyrhills building permit and a copy of the completed engineering plans must be RETURNED <br /> to the "LOT IMPROVEMENT C014b1CTTEE", these will be returned to you for construction. Upon <br /> completion of your construction a complete copy of the engineering drawings of the <br /> structure, (as built) permits, inspections and final permit approvals must be returned to <br /> the Emerald Pointe Lot Improvement Committee for Office filing. <br /> Pet enclosure must follow guidelines for size, height and location. <br /> ALL REQUESTS MUST COMPLY WITH CURRENT REQUIRED PERMITS FROM THE CITY OF <br /> ZEPHYRHILLS, PASCO COUNTY, OR-STATE OF FLORIDA CURRENT BUILDING CODES. <br /> Comments: <br /> a tt-V � ®"-+ aNL 0 b Z D 9)09-S <br /> '50 C4— U h L JLL, 97HS <br /> tb I n 1, c NITI rA 1075--i—G hL 6VI ST70-7 1r,,� <br /> Lot Owner Ia Signature Date /�/ JCS <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.