Laserfiche WebLink
J <br /> Optional Adder:_ <br /> • If AHCA Testing Is Required, Add and additional $1,650.00 <br /> Notes <br /> 1. 'This Quotation is based upon Engineering.Specifications& Drawings E4.1-E5.5. No other sections shall apply. <br /> 2. Quotation is valid for 60 days. If-not released to production within.60 days, pricing, delivery extension and <br /> escalation:charges may apply. <br /> 3. ACF Standby Systems is not responsible for any:delays.in delivery due-to Act of Nature, explosion,fire, strikes, <br /> accidents,war,-:terrorism,-flood, accidents or other causes beyond our-company control. Quoted shipping <br /> schedules:are not guaranteed and subject to change.without notice. In no case is ACF Standby Systems <br /> responsible for incidental or consequential damages. <br /> 4. ACF Standby Systems does not accept liquidated damages as a part of third party.contracts. <br /> -5. - Equipment will be invoiced.(and payment expected according to ACF's Terms and Conditions)at the time of <br /> shipment or when ready to ship from point of origin. Delays-by the buyer may result in storage fees and/or <br /> additional freight charges::: <br /> 6. : Completed equipment to be delivered to a 3rd party manufacturer for further fabrication will be invoiced upon <br /> shipment to the'3rd party manufacturer. <br /> 7. The warranty is that of the above-named manufacturer(s). Refer to the manufacturer's warranty statement for <br /> - <br /> details. No special warranty is implied. The.Manufacturer's warranty begins on the day of start-up or 6 months <br /> after shipment,whichever occurs first,'not substantial completion. It is the contractor's responsibility to <br /> coordinate start=up along with the date of substantial completion. <br /> If the generator set is not installed and ready for startup within 6 months of shipment it will require long term <br /> storage procedures. Please refer to the Operation and Maintenance Manual for such requirements. All costs <br /> related to long_term storage is the responsibility of the purchaser. Failure to follow these procedures may void <br /> warranty and affect equipment operation. Contact ACF Standby Systems for.assistance. <br /> 9. Additional sets of O&M manuals are available at an additional cost. The manufacturer's standard format shall <br /> apply. Custom.O&M manuals will be available at an additional charge. <br /> 10:. Startup services will not proceed until the-buyer's account is current and in good standing. <br /> 11. Quotation does not include offloading;rigging, anchoring, installation;exhaust plumbing, exhaust insulation, <br /> fuel or permitting. <br /> 12. ACF:Standby Systems is.not responsible for testing of fuel tank(s) provided by any party. Fuel tank testing,as <br /> required by FDEP (Florida.Department of Environmental Protection) Chapters 62-761'and 62-762, is the. <br /> responsibility of the.installing Contractor and Generator Permit Applicant.ACF Standby Systems LLC is not . <br /> responsible for damages or costs incurred.by any party,when a-fuel tank is filled before field testing required <br /> under FDEP or testing mandated-.by a Local Inspector of Authority under FBC, is performed. . <br /> 13. Pricing is subject to ACF Standby Systems'-PaymentTerms. <br /> Terms and Conditions <br /> Page 3 of 4. <br />