My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20981
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 10:38:57 AM
Creation date
1/14/2020 11:58:56 AM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE
Building Department - Doc Type
Permit
Permit #
19-20981
Building Department - Name
SMITH,CARL & MARGIE
Address
39649 QUARTZ DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All lot improvement requests must be submitted no later than Wednesday by 2:00 to be <br /> processed on the following committee meeting day.All permits must be posted visible to the <br /> street. <br /> Date Recd LOT nDROVMW REQUEST Permit No fs /0 <br /> To: EPPOA Lot Improvement Committee & Board of Directors <br /> From (please print S i*6L <br /> Lot#/Address: to #- e?aarle <br /> Phone number where you can be reached: 61 - 4,3 Cep so <br /> We request EPPOA approval for construction, addition to our Installation, on the <br /> following: <br /> Shed ( )Lanai O%IRV Port )Park Model Cottage ( )Concrete Slab Pavers <br /> Concrete Painting RV Skirting Landscaping ( }other <br /> All requests for construct:Lou/neAit;ions/x-emooeldzg are required to have a complete, <br /> detailed/sketch, to Include footprint, setbacks, front elevation, back elevation, left a <br /> right side elevation and top elevation. All elevations must Include all sizes and <br /> locations of windows and doors, with length, width and height of the overall structure. <br /> Park models-are. to include pamphlet with pictures. In addition, all requests require and <br /> must Include the full description, including color of siding, trim, shutters, doors, <br /> pavers and concrete painting If applicable. "PRIOR TO BEGINNING CONSTRUCTION11 a'cavy of <br /> the Zephythills building permit and.a copy of the completed -engineering plans must be <br /> RETUMMD to the "LOT IMPROVMEM COMMITTEE" these will be returned to you for <br /> construction. Upon completion of your construction a complete copy of the engineering <br /> drawings of the structure, (as built) permits, inspections and final permit approvals <br /> must be returned to the Emerald Pointe Lot Improvement Committee for Office filing. <br /> ALL REQUESTS MUST COMPLY WITH CURRENT REQUIRED PERMITS FROM THE CITY OF <br /> ZEPHYRHILLS, PASCO COUNTY, OR STATE OF FLORIDA CURRENT BUILDING CODES. <br /> Comments: <br /> U4 11 At 510raae. e 2&4all lnyck aloor. <br /> Lot Owner's Signature Date 16 <br /> 941p- Am"�-k <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.