Laserfiche WebLink
Project:DaVita Dialysis <br /> Title:DaVita Dialysis <br /> Type:Office 4 <br /> (WEA File:FL TAWA INTERNATIONAL.AP.tm3) i <br /> Building End Uses <br /> E <br /> 1)Proposed 2)Baseline { <br /> i <br /> Total 177.70 247.90 <br /> $2,774 $3,885 <br /> ELECTR1blTY(MBtu1kWh1$) 177.70 247.90 <br /> 52039 72613 <br /> $2,774 $3,885 <br /> AREA LIGHTS 39.90 57.70 <br /> 11686 16893 <br /> $623 $904 <br /> MISC EQUIPIMT 51.90 51.90 <br /> 15203 15203 i <br /> $810 S813 <br /> PUMPS&MISC 0.10 0.10 <br /> 41 40 <br /> $2 $2 <br /> SPACE COOL 49.20 73.30 f <br /> 14401 21470 <br /> $768 $1,149, i <br /> SPACE HEAT 2.70 3.60 <br /> 786 1052 <br /> $42 $56 <br /> VENT FANS 33.90 61.30 <br /> 9922 17955 <br /> $529 $961 <br /> Credits Applied:None PASSES <br /> Passing Criteria=3885 <br /> s <br /> Design(including any credits)=2774 i <br /> Passing requires Proposed Building cost to be at most 100%of <br /> Baseline cost.This Proposed Building is at 71.4% <br /> J <br /> I <br /> EnergyGauge Summit®FWCom-2017.TAM 2017-1.0 Compliant Software.Effective Date:Dec 31,2017 <br /> Florida Building Code,Sixth Edition(2017)-Energy Conservation ASHRAE 90.1-2013-Energy Cost Budget Option <br /> 12/6/2018 Page 5 of 29 <br />