�
<br /> '
<br /> NOTICE OF DEED RESTRICTIONS: The undersigned understands that this pe mit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulatio,ns. The undersigned assu es responsibility for Compliance with any
<br /> applicable deed restrictions.
<br /> �
<br /> -------`--- ----`---`-`-- AND'CONTRACTOR `---- -------`----1� If, the owner has'hired a contractor or
<br /> contractors-� to undertak~work, they be licensed in acco.
<br /> da ice with state and local regl.ulations -If-the -
<br /> contractor is not licensed as required by law, both the owner and contractor ay be cited,for a misdemeanor-violation
<br /> under state law. If the owner-or intended'contractor are uncertain as.to.what licensing requirements may apply forthe
<br /> intended work, they are advised to contact the Pasco County Building Inspectlop Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block" of this application-for which they will be res ?.I risible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is no'Fentifled to permitting privileges in Pasco
<br /> County. il
<br /> TRANSPORTATIONI.IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery, Fees may apply to th
<br /> #1 construction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pa co County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned--also-.understands,-that such fees, as m 1'�y be due,-will be identified at the time.of
<br /> permitting. It is further understood that Transportation Impact Fees and esol rce Recovery Fees must be paid prior to
<br /> receiving a "certificate of occupancy" or final power release. If the proje t doe I not involve a certificate of occupancy or
<br /> final power release, the fees-must be..paid prior to permit issuance. Furtherm re, if Pasco County Water/Sewer Impact
<br /> fees are due, th.ey,must.be paid prior to permit issuance in accordance,with app icable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes,-as am f valuation of work is $2,500.00 or more, I
<br /> certify that 1, the applicant, have been provided-with a copy:of the-"Fl�ri a Construction-Lien Law' —Homeowner's
<br /> Protection Guide",prepared by the F'lorida Department of Agriculture and Con�,`umer Affairs. If the applicant is someone.
<br /> other than the"owner", I certify that I have-obtained a copy of.the-above descri ed document.and promise in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> will be done in compliance with all applicable laws regulating construction, zoling and-land'"development. Application is
<br /> hereby made to obtain a permit to do work and,installation as indicated. �10 certify that no work or installation has
<br /> commenced prior to 7issuance, of-a permit and that all work will be performe' to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land develop �ent regulations in the jurisdiction. I*also
<br /> certify that I understand that the regulations of other government agencies miX.apply-to-the-intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such�agencies include but'are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads, ei and Areas,and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment. , I
<br /> Southwest Florida Water Management District.-Wells, Cypre s Bayheads, Wetlan,d Areas, Altering
<br /> Watercourses. 1
<br /> Army Corps of Engineers-Seawalls, Docks, Navigable Waterways;�
<br /> Department of Health & Rehabilitative Services/En'vironmental 'Health Unit-Wellt, Wastewater Treatment,
<br /> Septic Tanks.
<br /> US Environmental Protection Agency-Asbestos,abcltement;
<br /> Federal Aviation Authority-Runways.'
<br /> 1 understand that the following.restrictions apply.to the-use offill:
<br /> Use of fill is not allowed in Flood-Zone"V"unless expressly permitt d.
<br /> If the fill material is to be used in Flood Zone ".X, it is underlptood that a drainage plan addressing a
<br /> .compensating-volume" will be,submitted at time-of permitting. h4ch is prepared by.a professional engineer
<br /> licensed by the State of Florida.
<br /> If the fill material-is to-.be-used in- Flood Zone "X in conneCtionl� ith a permitted building using stem wall
<br /> construction, I certify.that fill will be-used only to fill the area within he ste wall.
<br /> If fill material is to be used in any area, I certify that use of S'luch fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect-adjacent propelrties,-the-owner may be cited for violating
<br /> the conditions of the building permit issued under the attac e rmit application, for lots less than one (1)
<br /> acre which.are elevated by fill- an engineered drainage plan s re ired.
<br /> If I am the AGENT FOR THE OWNER, I �romise in good faith to inform_t e--o' ner of the permitting-conditions set forth in'
<br /> this affidavit prior to commencing construction. I understand that a separate ermit may be required for electrical work,
<br /> plumbing, signs, wells-, pools, air conditioning,-gas, or other installations not!specifically included in-the application. Apermit issued shall be construed to be a license to proceed with the work an�d not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance-of a permitl revent the Building Official from thereafter
<br /> requiring a correction of errors in-plans, construction or violations of any code . Everypermit issued shall become invalid
<br /> unless-the work authorized by.,such-permit is commenced within six months 9f permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
<br /> may be requested, in.writing, from the.Building Official for a-,period not to ex Ileed ninety (90) days and will demonstrate
<br /> ..for ninety(90)consecutive
<br /> justifiable cause forthe extension. If work ceases
<br /> days, the job is considered abandoned.
<br /> WARNING-TO-OWNER: YOUR FAILURE TO RECORD A NOTICE Or C,I MMENCEMENT.MAY RESULT IN YOUR
<br /> PAYING TWICE FOWIMPROVEMENTS TO YOUR PROPERTY. IF YOU INt.'END-TO OSTAINFINANCING,CONSULT
<br /> -WITH YOUR LENDER OR-AN.AT-T-ORNE-Y-BEFORE-REC-ORDING--YOUR-'N6TICE-OF-COMMENCEMENT.
<br /> OWNER OR'AGENT
<br /> Subscribed and swom'.to(or affirmed)..before me this -Subscribedands rn to(,6raffirmed),,before-me this
<br /> Who is/are personally known to me or has/have produced Who is/are personally kno n tome ouhas/haye produced
<br /> as identification. _-As4dentification;
<br /> Notary PublicNotary Public
<br /> Commission
<br /> Name of Notary typed,printed or stamped Name of Notary typed,pni ted or stamped
<br /> �
<br /> ' U
<br /> u
<br />
|