Laserfiche WebLink
Compliance Summary <br /> Component Design Criteria Result <br /> Gross Energy Cost(in$) 747.0 1,228.0 PASSED <br /> LIGHTING CONTROLS PASSES <br /> EXTERNAL LIGHTING No Entry <br /> HVAC SYSTEM PASSES <br /> PLANT No Entry <br /> WATER HEATING SYSTEMS PASSES <br /> PIPING SYSTEMS No Entry <br /> Met all required compliance from Check List? Yes/No/NA <br /> IMPORTANT MESSAGE <br /> Info 5009 -- -- --An input report of this design building must be submitted along with this <br /> Compliance Report <br /> EnergyGauge Summit®Fla/Com-2017.TAM 2017-1.0 Compliant Software.Effective Date:Dec 31,2017 <br /> Florida Building Code,Sixth Edition(2017)-Energy Conservation IECC 2015-Total Building Performance Compliance Option <br /> 10/5/2018 Page 3 of 22 <br />