Laserfiche WebLink
Mandatory Additional C406.7,C406.7.1 Project Enhanced Service Water Heat System efficiency ❑ ❑ <br /> package.One of the following SWH system <br /> enhancements must satisfy 60 percent of hot <br /> water requirements,or 100 percent if the building <br /> otherwise complies with heat recovery per Section <br /> C403.4.5:Waste heat re <br /> HVAC C408.2.2.1 Mechanical Air outlets and zone terminal devices have means ❑ <br /> for air balancing. <br /> HVAC C408.2.2.1 Mechanical Air outlets and zone terminal devices have means ❑ ❑ <br /> for air balancing. <br /> Testing C408.2.3.2 Mechanical HVAC control systems have been tested to ❑ ❑ 13 <br /> ensure proper operation,calibration and <br /> adjustment of controls. <br /> 4. To be checked by Inspector at Project Completion and Prior to Issuance of <br /> Certificate of Occupancy <br /> Post Construction C303.3,C408.2.5.2 Interior Lighting Furnished O&M instructions for systems and 1�11111 <br /> equipment to the building owner or designated <br /> representative. <br /> Post Construction C303.3,C408.2.5.3 Mechanical Furnished O&M manuals for HVAC systems ❑ 11 ❑ <br /> within 90 days of system acceptance. <br /> Fenestration C402.4.2.2 Envelope Skylights in office,storage,automotive service, ❑ <br /> manufacturing,non-refrigerated warehouse,retail <br /> store,and distribution/sorting area have a <br /> measured haze value>90 percent unless <br /> designed to exclude direct sunlight. <br /> Post Construction C408.2.1 Mechanical Commissioning plan developed by registered <br /> design professional or approved agency. <br /> Post Construction C408.2.3.1 Mechanical HVAC equipment has been tested to ensure ❑ ❑ ❑ <br /> proper operation. <br /> Post Construction C408.2.3.3 Mechanical Economizers have been tested to ensure proper <br /> operation. <br /> Post Construction C408.2.4 Mechanical Preliminary commissioning report completed and ❑ <br /> certified by registered design professional or <br /> approved agency. <br /> Post Construction C408.2.5.1 Mechanical Furnished HVAC as-built drawings submitted <br /> within 90 days of system acceptance. <br /> Post Construction C408.2.5.1 Interior Lighting Furnished as-built drawings for electric power <br /> systems within 90 days of system acceptance. <br /> Post Construction C408.2.5.3 Mechanical An air and/or hydronic system balancing report is <br /> provided for HVAC systems. <br /> Post Construction C408.2.5.4 Mechanical Final commissioning report due to building owner ❑ ❑ <br /> within 90 days of receipt of certificate of <br /> occupancy. <br /> Post Construction C408.3 Interior Lighting Lighting systems have been tested to ensure <br /> proper calibration,adjustment,programming,and <br /> operation. <br /> EnergyGauge Summit®Fla/Com-2017.TAM 2017-1.0 Compliant Software.Effective Date:Dec 31,2017 <br /> Florida Building Code,Sixth Edition(2017)-Energy Conservation IECC 2015-Total Building Performance Compliance Option <br /> 10/5/2018 Page 15 of 22 <br />