My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21343
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:03:49 PM
Creation date
4/13/2020 1:03:30 PM
Metadata
Fields
Template:
Building Department
Company Name
BAHR'S PROPANE GASE & A/C
Building Department - Doc Type
Permit
Permit #
19-21343
Building Department - Name
BAHR'S PROPANE GAS & A/C
Address
3708 COPELAND DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Right-Suite@ Universal 2018 Load Summary Job: C0918485 <br /> wrlghtsoft* By Date: SepAMA 27,2018 <br /> RR . <br /> Project Information <br /> For: Bahr's Propane Gas&AC Inc <br /> 3708 Copeland Or Zephyrhills,FL 33542 <br /> Zone Rk -LOAD ne -------.,---.--COOLING <br /> 1. DESIGN CONDITIONS atAug 1700 LOT Peak load at Sep 1700 LDT <br /> Inside: 75 OF Outside: 92 OF TD: 17 OF <br /> RK 55 % MoistDif 59.3 grAb Mult 1.0 Ins.wb 63 OF <br /> Sensible Latent <br /> 2. SOLAR RADIATION THROUGH GLASS 0 <br /> 3. TRANSMISSION GAINS Sensible 266 <br /> Walls: 170 - - <br /> Glass: 0 - - <br /> Doors: 0 - - <br /> Partitions: 0 - - <br /> Floors: 0 - - <br /> Ceilings: 96 - - <br /> 4. INTERNALHEAT GAIN Sensible Latent 127 0 <br /> Occupants: 0 0 - - <br /> Lights: 127 - <br /> Motors: 0 - <br /> Appliances: 0 0 - - <br /> 5. INFILTRATION: Outside air cfm: 0 0 0 <br /> 6. SUBTOTAL: Space load Sensible Latent 393 0 <br /> Envelope 393 0 - - <br /> Less external 0 - <br /> Redistribution 0 0 - <br /> 7. SUPPLY DUCT 70 <br /> 8. SUBTOTAL: Space load+supply duct 463 <br /> Actual cfm: 31 at supply TD: 20 - - <br /> 9. VENTILATION: Make-up air cftn: 0 0 0 <br /> 10. RETURNAIRLOAD: Lighting+plenum(net) 0 - <br /> 11. RETURN DUCT 66 - <br /> 12. TOTAL LOADS ON EQUIPMENT 529 76 <br /> HEATING LOAD <br /> 13. DESIGN CONDITIONS Mult 1.0 <br /> Inside: 70 OF Outside: 43 OF TD: 27 OF <br /> 14. TRANSMISSION LOSSES 1127 <br /> Walls: 158 - <br /> Glass: 0 - <br /> Doors: 0 - <br /> Partitions: 0 - <br /> Floors: 205 - <br /> Ceilings: 763 - <br /> 15. INFILTRATION: Outside air cfm: 4 123 <br /> 16. SUBTOTAL- Space load 1249 <br /> Envelope 1249 - <br /> Less external 0 <br /> Less transfer 0 <br /> Redistribution 0 <br /> 17. SUPPLY DUCT' 134 <br /> 1& VENTILATION: Make-up air cfm: 0 0 <br /> 19. HUMIDIFICATION 50 <br /> Piping 0 <br /> 20. RETURN DUCT 31 <br /> 21. TOTALHEATING LOAD ON EQUIPMENT 1464 <br /> -Fk wr14ghtsCxrV_ 2018-Oct-0511:03:53 <br /> Rgft-Sdte@ Ujiversal 2018 18.0.27 RSU09290 Page 3 <br /> obs\00918485-Bahm-BatrsPropaneX()0918485,rLp Calc=MN5 BU1dingFrortfaoes:W <br />
The URL can be used to link to this page
Your browser does not support the video tag.