Laserfiche WebLink
!NSTALLATION WITH FIN FRAME <br /> EDGE BS7 TE E <br /> DISTANCE j <br /> EXTERIOR tl <br /> I <br /> SHIM <br /> EDGE I <br /> DISTANCE <br /> EXTERIOR ff� <br /> t <br /> I <br /> 77 <br /> FIN FRAME <br /> HEAD INSTALLATION I <br /> t#{I <br /> 1` 1 SHIM t <br /> i <br /> FIN FRAME. <br /> JAMB INSTALLATION <br /> SUBSTRATE I <br /> Ic <br /> SHIM `�=''•``_.v`= r+ <br /> G.6105 <br /> BST TE EXTERIOR <br /> FIN FRAME, <br /> SILL INSTALLATION °a°"Br °iq'` 1P1M n�iapauno`1na,Gvmar�cx7v�•um <br /> J.ROSOWSKI 08108111 ALUMINUM 6083-T6 } <br /> an»Pao•nWraxr:aaPWWUoF IM <br /> maaxxrwraewmaew <br /> INSTALLATION NOTES: avrrxWxmiomns�ssrnncnro/ <br /> rk'idcsawwicrrntmmEc <br /> 1}SEE SHEET 1 FOR ANCHORAGE,SUBSTRATE AND SPACING REQUIREMENTS. 7�2-r <br /> 2)GLASS SHOWN AS EXAMPLE.MAY VARY BY SERIES AND DESIGN PRESSURE REQUIREMENTS. 1070 TECHNOLOGY DRIVE rrh <br /> 3)FOR SMOOTH SASH OPERATION,THE ANCHORS MUST BE FLATHEADS. NOKOMIS.FL 34275 <br /> 4)MAX.SHIM THICKNESS TOBE1/4". FL CERT.OF AUTH.:29296 SINGLE HUNG INST.,STD.MEETING RAIL <br /> 5)FIN MAY BE REMOVED TO CREATE EQUAL-LEG FRAME-USE FLANGE FRAME INSTALLATION. A.Lynn Miller,P.E. <br /> P.E.N8705 SH-200&200PT NTS 3 at 3 1032411JR j <br /> 1 <br /> t <br />