My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21491
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 6:41:32 AM
Creation date
4/15/2020 6:41:28 AM
Metadata
Fields
Template:
Building Department
Company Name
DOLLAR GENERAL
Building Department - Doc Type
Permit
Permit #
19-21491
Building Department - Name
ZEPHYR LLC
Address
5947 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roofing, Inc. <br /> am eW <br /> 8949 Gall Boulevard,Zephyrhills, A 33541 <br /> PH: (81-8) 782-0920-&1352) 567-8580 Fax: (813) 715-4875 <br /> .$tAT9:CERt.IF19D BUILDING AND ROOFING C,0NTRA&OR#CB-00$9817 anti*CO-00581 34 <br /> SERVING FLQRIDk1sT1NE,ST HomES.&]BUSINESSES SINCE 1976 wwwAchapereftstructionxom <br /> Name: Zephyr LLC. .0ate:.June,20,2019 <br /> Address: 7162 Reading-Rd.Suite 730 Phone:513-608-3619 Mark <br /> Cincinnati,Oh-45237 Email: aertnark@.gmaii.com <br /> Re:.5947 Gall Blvd 2;613hy—rhills Fl- PvDr4" e--fTevq) ev '4-:9D-6 <br /> We Hereby,Propose To Furnish.Materials Arid Labor Necessary For The Completion Of: <br /> Comipiete-Wroof of Above, Duro Last@ Roofing Sntwn 50 Mil. <br /> With NO DOLLAR.LBUT WARRANTY (attached). <br /> INCLUDING <br /> 1. Barricade Off Work.Area As.Nee.ded. <br /> '2. Remove Existing.Roofing.Materials,.Due.To Saturation,Deck Only <br /> 3. Remove Existing Flashings:Arid Boots As Required. <br /> 4., Check Substrate Decking,For Wzter Damage. Replacement OfDecking Will Be Done <br /> On A Time And Material Basis-At.The.Rate,Of$54.00 Dollars;Per Man-Hour Plus <br /> Materials Marked Up At.25% Contractors Fee. <br /> 5. Install 1 V2"ISO Insulation, (8,5 R.-Value)Mechanically Attached.Per Manufactures <br /> Specification. <br /> 6.. Install 4oz Felt Geotextile Slip Sheet <br /> 7. Install Duro. L-ast@-Membrane For A 20- Or y,Year Material And Lab W' arranty, 50Mil S. Disconnect And.Reconnect:A/Cs As Required. <br /> *9. Install New Dam,LastO Boots;.Custom-Curb And Comers As Required. <br /> 1 G.Install Duro.Last@ Two—Way V dnts.As Required, <br /> Zg;. ► Roofmg.Commitinent to Quality <br /> *All work shalt bev car"y supervised and completed by workmen skilled and knowledgeable in methods <br /> needed,to produce high quality-work. <br /> *The i ob site.shall be kept clean.,daily.for the duration of the job and the grounds-shall be left clean of all roof <br /> related debris after completion; <br /> oThe Parking Lot shall.be.swept-Mth amagnot. <br /> Zephy LLC Roof Quote June 2019 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.