My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21494
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 6:44:59 AM
Creation date
4/15/2020 6:44:45 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-21494
Building Department - Name
D.R. HORTON
Address
7018 SILVERADO RANCH BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017- AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA' <br /> TABLE 402.4.1.1 <br /> AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> Project Name: Cali 1828 Elev D Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City,State,Zip: Zephyrhills,FL, Permit Number: <br /> W <br /> Owner: Jurisdiction: <br /> • x <br /> Design Location: :FL,Tampa c� <br /> COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA <br /> General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shall <br /> The exterior thermal envelope contains a continuous air barrier. . not be used as a sealing material. <br /> requirements Breaks or joints in the air barrier shall be sealed. <br /> Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit <br /> the insulation*and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. <br /> Access openings,drop down stairs or knee wall doors to <br /> unconditioned attic spaces shall be sealed. <br /> Walls The junction of the foundation and sill plate shall be sealed.. Cavities within corners and headers of frame walls <br /> The junction of the top plate and the top of exterior walls shall be, shall be insulated by completely filling the cavity <br /> sealed, with a material having a thermal resistance of R-3 <br /> 'Knee walls shall be sealed. per inch minimum. <br /> Exterior thermal envelope insulation for framed <br /> walls shall be installed in substantial contact and <br /> continuous alignment with the air barrier. <br /> Windows,-skylights The space between window/door jambs and framing;and and doors. skylights and framing shall be sealed. . <br /> Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. <br /> Floors The air barrier shall_be installed at any exposed edge of Floor framing cavity insulation shall be installed to <br /> (including insulation. maintain permanent contact with the underside of <br /> above-garage subfloor decking,or floor framing cavity insulation <br /> and cantilevered shall be permitted to be in contact with the top side. <br /> floors) of sheathing,or continuous insulation installed on <br /> the underside of floor framing and extends from the <br /> bottom to the top of all perimeter floor framing <br /> members. <br /> Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation <br /> a Class 1 vapor retarder with overlapping joints taped. , shall be permanently attached to the crawlspace <br /> Shafts,penetrations. Duct shafts,utility penetrations,and flue shafts opening to <br /> exterior or unconditioned space shall be sealed. <br /> Batts in.narrow cavities shall be cut to fit,or narrow <br /> Narrow cavities cavities shall be filled by insulation that on <br /> installation readily conforms to the available cavity <br /> spaces. <br /> Garage separation Air sealing shall be provided between the garage and conditioned spac 9s. <br /> Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures4ristalled in the building <br /> shall be sealed.to the drywall. thermal envelope shall be airtight.and IC rated. <br /> Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring <br /> and plumbing in exterior walls,or insulation that on <br /> Installation readily conforms to available space shall <br /> extend behind pipina and wiring. <br /> Shower/tub. The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall <br /> on exterior wall tubs shall separate them from the showers and tubs. be insulated. <br /> Electrical/phone box or The air barrier shall be installed behind electrical or communication <br /> exterior walls boxes or air-sealed boxes shall be installed. <br /> HVAC register boots HVAC register boots that penetrate building thermal envelope shall <br /> be sealed to the sub-floor or drywall. <br /> Concealed When required to be sealed,concealed fire sprinklers shall only be <br /> sprinklers sealed in a manner that is recommended by the manufacturer. <br /> Caulking or other adhesive sealants shall not.be used to fill voids <br /> a.In addition,inspection of log walls shall be in accordance with the provisions of iCC 400, <br /> 3/14/2019 11:16 AM EnergyGaugeO USA FBC 6th Edition(2017)Compliant Software Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.