My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21503
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 6:53:03 AM
Creation date
4/15/2020 6:52:36 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
19-21503
Building Department - Name
CITY OF ZEPHYRHILLS (POLICE DEPT)
Address
6118 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Equipment requiring 1,000 Watts or more shall have a power factor of 85% or <br /> greater at rated load conditions. Equipment with power factor less than 85% shall <br /> be corrected to at least 90% under full load operating conditions. Power factor <br /> corrective devices shall be switched with related equipment. <br /> h. Motor characteristics which change from that specified, due to the Contractor <br /> electing to use one of the optional manufacturers, or an updated model, etc., <br /> shall be coordinated with the Electrical Contractor prior to bid. This Contractor is <br /> responsible for the cost of any revisions necessary to provide proper power and <br /> control connections in full accordance with the National Electric Code. <br /> B. Air conditioning equipment containing various electrical components within its housing shall be <br /> furnished with internal wiring arranged to terminate at one set of electrical power lugs. <br /> Components shall be approved for group operation as defined by National Electrical Code, or <br /> auxiliary equipment must be provided as required to satisfy the National Electrical Code and UL <br /> Labels (or other labels) of the unit. <br /> C. All three-phase compressorized units (i.e. condensing units, etc.) shall be provided with the <br /> manufacturer's standard phase loss protection. <br /> 3.6 PAINTING <br /> A. All work shall be left clean and free from oil, dirt and grease prior to field painting. <br /> B. Upon completion, thoroughly clean all equipment, ductwork, piping and other work to remove all <br /> dirt, grease, rust and oil. Thoroughly prepare all such work for painting. <br /> C. Equipment: <br /> 1. All equipment shall have factory standard finish. <br /> 2. Factory finished equipment which has rusted or been damaged shall be repaired, <br /> cleaned, spot primed and entirely repainted the original color. <br /> 3. Insulation coverings shall be cleaned, sized (if necessary), and painted for service <br /> identification. <br /> D. Ferrous metals which are not exposed to view within the building, such as piping, pipe hangers, <br /> angle supports, supports for apparatus, black iron partitions or casings, tanks, etc., shall be <br /> painted with one coat of priming zinc chromate. <br /> E. Ferrous metals which are exposed to view or to the weather, such as pipes, pipe supports, <br /> supporting or stiffening angles for exhaust elbows, exhaust heads, air conditioning units, etc., <br /> shall be painted in accordance with the Painting Section of the Project Manual. <br /> 3.7 PENETRATIONS <br /> A. Penetrations of special materials (such as face brick, plaster, dry wall, precast concrete, etc.) <br /> shall be done by the trades doing such original work. <br /> B. Penetrations shall be cut or patched by such skilled mechanics in a manner that the hole is <br /> uniformly 1/8 inch clear all around the item penetrating it (including insulation) so that a full <br /> penetration (but not excessive) sealant bead can be installed. <br /> C. Any pipe penetrating a wall which tends to vibrate, shall have sufficient corrective <br /> methods affected to one or both sides of the penetration that no vibration occurs <br /> at point of penetration. <br /> CEA#18010 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) 23 00 00 -8 <br /> COPYRIGHT©2018 CONSULTING ENGINEERING ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.