My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21503
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 6:53:03 AM
Creation date
4/15/2020 6:52:36 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
19-21503
Building Department - Name
CITY OF ZEPHYRHILLS (POLICE DEPT)
Address
6118 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3-EXECUTION <br /> 3.1 PREPARATION <br /> A. Proceed with installation of hangers, supports and anchors only after required building structural <br /> work has been completed in areas where the work is to be installed. Correct inadequacies <br /> including (but not limited to) proper placement of inserts, anchors and other building structural <br /> attachments as may be required. <br /> 3.2 INSTALLATION OF BUILDING ATTACHMENTS <br /> A. Install building attachments at required locations, within concrete or on structural steel for proper <br /> piping support. Space attachments within maximum piping span length indicated in MSS SP-69. <br /> Install additional building attachments where support is required for additional concentrated loads, <br /> including valves, flanges, guides, strainers, expansion joints, and at changes in direction of <br /> piping. Install concrete inserts before concrete is placed; fasten insert securely to forms. Where <br /> concrete with compressive strength less than 2500 psi is indicated, install reinforcing bars <br /> through openings at top of inserts. <br /> 3.3 INSTALLATION OF HANGERS AND SUPPORTS <br /> A. Install hangers, supports, clamps and attachments to support piping properly from building <br /> structure; comply with MSS SP-69. Arrange for grouping of parallel runs of horizontal piping to be <br /> supported together on trapeze type hangers where possible. Install supports with maximum <br /> spacing complying with MSS SP-69. Where piping of various sizes is to be supported together by <br /> trapeze hangers, space hangers for smallest pipe size or install intermediate supports for smaller <br /> diameter pipe. Do not use wire or perforated metal to support piping, and do not support piping <br /> from other piping, ductwork or other supported mechanical or electrical items. <br /> B. Supports and hangers shall be installed to permit free expansion and contraction in the piping <br /> systems. Hangers shall permit vertical adjustment to maintain proper pitch. Where necessary to <br /> control expansion and contraction, the piping shall be guided and firmly anchored. No piping <br /> shall be self-supporting; nor shall it be supported from equipment connections. <br /> C. Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers and <br /> other accessories. Except as otherwise indicated for exposed continuous pipe runs, install <br /> hangers and supports of same type and style as installed for adjacent similar piping. Provide <br /> section drawing for hanger locations to avoid duct interference. <br /> D. Prevent electrolysis in support of copper tubing by use of hangers and support which are copper- <br /> plated, or by other recognized industry methods. <br /> E. Provisions for Movement: <br /> 1. Install hangers and supports to allow controlled movement of piping systems and to <br /> permit freedom of movement between pipe anchors, and to facilitate action of expansion <br /> joints, expansion loops, expansion bends and similar units. <br /> 2. Load Distribution: Install hangers and supports so that piping live and dead loading and <br /> stresses from movement will not be transmitted to connected equipment. <br /> 3. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes, and so that <br /> maximum pipe deflections allowed by ANSI B31 are not exceeded. <br /> 4. Insulated Piping—comply with the following installation requirements: <br /> a. Clamps: Attach clamps, including spacers (if any), to piping with clamps <br /> projecting through insulation; do not exceed pipe stresses allowed by ANSI B31. <br /> b. Shields: Where low compressive strength insulation or vapor barriers are <br /> CEA#18010 SUPPORTS,ANCHORS AND SEALS 23 05 30-5 <br /> COPYRIGHT©2018 CONSULTING ENGINEERING ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.