Laserfiche WebLink
S P E N_ C E R <br /> -rep HNOL O G I E S <br /> Signage Scope of Work <br /> General Signage Scope of Work(SOW) <br /> 1: All foundation and signage work is to be coordinated with the Electrical Contractor. <br /> 2. Confirm that the municipality has performed utility locating before beginning any excavation work. <br /> 3:_ Only one driveAhru lane maybe closed off at any given time.Safety cones or caution tape must be <br /> used to alert customers that a lane is temporarily closed and the manager on duty notified prior to <br /> closure.Any closed lane must be re-opened as soon.as possible. <br /> 4. Excavation,footing design and installation work must be in,corhpliance with local building codes and <br /> per engineered plans and site layouts(see Foundation Drawings below)to meet the designated wind <br /> speed requirements for each specific site(120/150 MPH and 180.MPH wind speed sites)and foundation <br /> count(2,3 or 4 new concrete footings per site): <br /> 5. Signage Contractor shall supply and install Sonotubes; rebar cages and Spencer provided galvanized <br /> anchor bolt kits per site for each footing(2,3 or 4 footings per site as required): <br /> 6. Supply and install 3500 psi concrete in all footings, per the engineered plans. <br /> 7. Signage Contractor shall assist Electrical Contractor with electrical conduit placement inside <br /> footings. <br /> 8. Signage Contractor to,contact and coordinate with Building Inspector to inspect footings prior to <br /> pouring concrete. <br /> 9. Signage Contractor shall mount new Customer Order Display(COD)placard on the existing COD <br /> unit. <br /> 10. Once new Pre-Selland_ODMB boards are installed,tested and confirmed in proper working <br /> condition,the Signage Contractor shall: <br /> o Remove the old menu boards from their mounts <br /> o Cut the anchor bolts from their.foundations <br /> o R,emoye for recycling any fluorescent light bulbs(if* ot LED) <br /> o Place supplied foundation covers over the old foundations <br /> o Put the old menu boards in the supplied construction dympster. <br /> 11. All work areas must have the landscaping returned to previous condition,ground leveled and <br /> installation materials removed. <br /> 12. Permits and permit fees supplied by Spencer. <br /> 13. All materials below will be supplied by Spencer: <br /> o COD Placard <br /> Page 3 of 8 Spencer=Project Electrical and Sign SOW 06202018 <br /> Template ID:SOW20161024 January 31,2019 <br />