Laserfiche WebLink
service post. If possible, add the sub panel circuits to the new meter panel comi✓;- <br /> when it is installed. If the sub panel circuits can not be added to the meter panel <br /> combo, the sub panel will be remounted to a new concrete post adjacent to the <br /> service. Sufficient bracing will be installed to support and strap the conduit to <br /> the sub panel. The sub panel is in good condition. <br /> This work will require a disconnect by Duke Energy and a permit and inspection by <br /> the building department. <br /> > 7/3/2019 WED 3: 11 PM> LELAND A: <br /> RTD <br /> > 7/3/2019 WED 4:04 PM> justin s: <br /> Quote emailed <br /> > 7/8/2019 MON 10: 16 AM> ROBERTO C: <br /> Mr. Joe Brown accepted quote via phone call. Would like for us to complete this <br /> work on the week of the 17th. <br /> > 7/17/2019 WED 8:04 AM> LELAND A: <br /> Will need a permit for each service and a disconnect by Duke. <br /> Service change-out <br /> 150 amp services <br /> post mounted <br /> Price is Per Stated Quote .1.00 3218.69 3218.69 <br /> Subtotal Total <br /> 3218.69 $3,218.69 <br /> All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or <br /> deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above <br /> the estimate. All agreements contingent upon delays beyond our control. Purchaser agrees to pay all costs of collection,including attorney's fees. <br /> Signature Date <br />