Laserfiche WebLink
NOTICE-OF DEED.RESTRICTIONS: The undersigned understands:that this,permit may be subject to"deed"restrictions". <br /> which may be more restrictive than County regulations. The undersigned'assumes responsibility for compliance with any <br /> applicable deed restrictions. . <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If,the owner has hired a contractor or <br /> contractors to undertake:work,they.may be,required.to be licensed in accordance with state and local regulations: If the <br /> contractor is not licensed as required bylaw, both the owner and contractor may.be cited for a:misdemeanor.violation <br /> understate law. If the owner.or intended contractor are uncertain as to what licensing requirements may apply for the <br /> intended work;they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired:a contractor or contractors,:he is advised to have the contractor(s) sign <br /> portions'of the"contractor Block"of this application for which they will be responsible. If you,,as the owner sign as the <br /> contractor;that may be an indication that he is not properly licensed and is not entitled'to permitting privileges in Pasco <br /> County.. <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of <br /> use in existing buildings;.or expansion of-existing buildings, as specified in Pasco.County Ordinance number 89-07 and . <br /> 90-07, as:amended.. The undersigned:also understands,that such fees, as may be due,will be identified at the time of <br /> permitting. It-is further understood that Transportation'Impact Fees and Resource Recovery Fees must be paid prior to, <br /> receiving a"certificate of occupancy"or final.power release: If the project does not involve a certificate of occupancy or . . <br /> final power release;the fees must be paid prior-to permit issuance. Furthermore, if Pasco County Water/Sewer Impact <br /> fees are due,they must be paid prior.to.permit issuance in accordance with applicable Pasco County ordinances: <br /> CONSTRUCTION LIEN LAW(Chapter 713,'Florida Statutes,as amended):. If valuation of.work is$2,500.00.or.more,1. <br /> certify that I, the applicant, have been provided with a'copy of the "Florida Construction Lien Law—Homeowner's <br /> Protection Guide"prepared by the Florida Department of,Agriculture and Consumer Affairs. If the applicant'is someone <br /> other than.the"owner",I certify that I have obtained a copy of the above described.document and promise in good faith to . . <br /> deliver.It to the"owner'prior to commencement. - <br /> CONTRACTOR'S/OWNER'S.AFFI DAVIT: 1 certify that all the information in this application is accurate and that all work <br /> will be.done in compliance with all.applicable laws regulating construction,zoning and land development. Application is . <br /> hereby-made'to obtain a.permit to do work and installation as indicated:, I certify that no work'or installation has. <br /> commenced prior to issuance of,a'permit and that all work will be.performed to meet standards of all laves regulating. <br /> .construction, County and.City codes, zoning regulations;and land.development regulations in'the.jurisdiction. .I.also. <br /> certify that I understand that the regulations of other government agencies.may apply to the intended work,and that it is <br /> my responsibility to identify what actions I must take.to,be in compliance. Such agencies include but are not.limited to: <br /> Department.of Environmental Protection-Cypress Bayheads,'Wetland Areas and Environmentally Sensitive <br /> Lands,Water/Wastewater Treatment. <br /> - Southwest Florida Water Management District Wells, Cypress Bayheads, Wetland Areas,- Altering <br /> .Watercourses. <br /> Army Corps of Engineers-Seawalls;Docks,Navigable Waterways. <br /> Department of Health & Rehabilitative Services/Environmental.Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks.. . . <br /> - US Environmental Protection Agency-Asbestos abatement. <br /> Federal Aviation Authority-Runways.. . <br /> I understand[hat the following restrictions-apply to the use of fill: <br /> Use of fill is not allowed in Flood Zone"V"unless expressly permitted. <br /> If tho -III material is to be'used in .Flood Zone "A", it is understood .that a drainage plan addressing_ a . <br /> "compensating volume"will be submitted:at time of permitting which is prepared by a professional engineer <br /> licensed by the.State of Florida:. <br /> If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall. <br /> construction,.1 certify that'fill.will'be used only to fill the area within the stem wall. <br /> - If fill material:is to be used in any area, I certify that use of such fill will not adversely affect adjacent <br /> properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for:violating <br /> the conditions of the building permit issued under the attached permit application,for lots less than one(1) <br /> acre which are elevated by fill,an engineered drainage plan is required. <br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth,in <br /> this affidavit prior to commencing construction. I understand that a separate permit may be required.for electrical work, <br /> plumbing,sighs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A <br /> permit issued shall be construed to be a license to proceed with.the.work and not as authority to violate, cancel,alter,or <br /> set aside any provisiolis of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter <br /> requiring a correction.of errors in plans,construction or violations of any codes. Every permit issued shall become.invalid <br /> unless tiie work authorized by such permit is commenced within six months of permit issuance,or if work authorized by. <br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension <br /> ,maybe requested, in writing,from the Building Official.for a period not to exceed ninety(90) days and will demonstrate <br /> justifiable cause.for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. " <br /> 1AFARl'1lNG TO 0111fBIER: YOUR FP.ILL1fzl: TO RECORD A NOTICE OF CO{M[MEIVCEMENT iMAY RESULT IN YOUR <br /> PAYIHG iVdiCE FOR IiJIPROVEMENTS TO YOUR PROPERTY. IF.YOU INTEND'TO OBTAIN FINANCING,'CONSULT <br /> kilftTH YbUR_LL NDER OR AN AT T 012NEY BEFORE REdORDING YOUR NOTICE OF COMMENCEMENT. <br /> FRO OA JURAT(F:S.117.03) <br /> OWNERORAGENT CONTRACTOR, <br /> Subscribed and swom to(or affirmed)before me this Subs( 'bad nd sworn r affirmed)bef r� a thj <br /> by _ / _&by /l::gNd <br /> Who is/are personally known to me or has/have produced o' e pe y crown to me or s/hav roduced" <br /> as identification ification. <br /> _Notary.Public Notary Pic. <br /> Commiission;No. Commission No. ` <br /> v,e� Wtf� 1• i <br /> Name of Notary typed,printed or.stamped Name of Notary fyped,printed or' <br /> KELVIN MATHIS <br /> c=a ub°estate of Florida-Notary Public <br /> • Commission # GG 170775 <br /> P My Commission,Expires <br /> December 25, 2021 <br />